Practical Measures to Tackle Climate Chaos David Somervell, Energy & Sustainability Manager University of Edinburgh – Estates & Buildings Department 13 Infirmary Street, Edinburgh EH1 1LT Tel 0131 650 2073 http://www.eso.ed.ac.uk David.Somervell@ed.ac.uk
2
Universities and Colleges 1.Crisis? What Crisis? [It is for real] 2.How will this affect our institution? 3.Developing a Strategic Approach 4.Invest now in Utilities Infrastructure 5.Decentralised Energy on Campus
7
By 2050 we must cut CO 2 emissions by 7 GtC with a 1.3 GtC cut by 2025, against projectedBusiness as Usual. 1990 550 ppm 450 ppm 6 - 5 - 4 - 3 - 2 - 1 - °C Global Carbon Emissions, GtC WRE 1000 (IPCC) WRE 550 (IPCC) WRE 450 (IPCC) 1000 ppm 2100 range Further rises to 2300 205020402030202020102000 6 8 10 4 12 14 16 2 200020102020203020402050 9 11 13 7 Global Carbon Emissions, GtC 2025 1.3 GtC reduction Facts & Trends IPCC Scenarios 2050 6-7 GtC reduction Facts & Trends 9 GtC world BAU Pathways to 2050 Projections & Required Reductions
16
Extreme droughts will plague sub-Saharan Africa. Children stand behind one of thousands of livestock that died from thirst in southern Ethiopia. [REUTERS March 2006]
17
Whats needed? 1.Interested, Enthusiastic People 2.Senior Management Support 3.Allocation of Resources (Money) PLUS … Some Measure of Luck / Timing!
19
Edinburgh: University in the City … invested £12million in Decentralised Energy / CHP 2002-2005 Pollock Halls 526kWe CHP Kings Bldgs 2.7MWe CHP George Sq 1.6MWe CHP
20
Edinburghs 3 CHP Projects 1.Pollock Halls: 526kWe engine serving student residences as lead boiler – 2003 2.The Kings Buildings: 2.7MWe engine displaced old steam system + 2 new 7.5MW LTHW boilers serving high base load – 2004 3.George Square: 1.6MWe engine again replaced steam system – plus 75 tonne Heat Store and 600kW Absorption Chiller to even out load – 2005
21
UK Energy Flows – 50% wasted
22
Combined Heat and Power
23
George Sq: Trigeneration
24
George Square Energy Centre
25
George Sq buildings now linked:
26
First remove old steam boilers…
27
1.6MWe Alternator bolts on
28
High Efficiency, Low NOx Boiler
29
75 cubic metre Thermal Store
30
GE Jenbacher 612 Engine 12 cylinder Jenbacher Engine
31
600kW Absorption Chiller
32
Thanks to our CHP Partners Energy Saving Trust – for funding support PB Power – for Scheme Design Crown House Technologies – Main Contractor Estates & Bldgs Works Divn – implementation Clarke Energy – Jenbacher Maintenance www.eso.ed.ac.uk
33
Rankine Engineering Building
34
Building Integrated PhotoVoltaics
35
Why we have done this …? Save money long-term Invest in infrastructure Annual Carbon savings Leadership role
36
…because there is only 1 planet