1 Hybrid & Module Testing Status
Week of 5/2-5/6

2 UCSB Hybrid Testing Status
Weekly Cumulative Pass Fail % Pass L12pd 0.00% L34p 368 5 98.66% L56p 19 385 98.72% R5N 9 1 74 3 96.10% R5S 41 88 96.70% R6 87 98.86% R7 Total 69 4 1002 17 98.62% Failing Hybrids Over-counted

3 UCSB Hybrid Testing Failures
This Week 4 with shorts in PA Lithography errors-fixable Cumulative 7 with Shorts in PA Repairable 1 Major Scratch in PA 1 Smashed APV-PA Bonds 2 Failed Inspection Never should have sent 1 Broken Ceramic 1 Bad Bond Feet 1 Weak Wirebonds 1 Too Many Opens 2 with unknown failure

4 UCSB Hybrid Testing Issues
Need to finish validation of new software Bruno contacted about bugs/features Need to add automatic upload of data to new software Hybrids with shorts need repairing Once repaired need to keep bookkeeping straight

5 UCSB ARCS Testing Status
Weekly Cumulative A B F % A or B L12pu 0.00% L12pd L12su L12sd L34p 85 1 98.86% L56p 54 331 2 99.40% R5N 38 97.50% R5S 17 100.00% R6 20 88 R7 Total 91 560 3 4 99.29%

6 UCSB ARCS Testing Failures
This Week None Fixed 1 module Found the problem with another Fixable Cumulative 1 with >2% Bad Channels Debris on sensor 1 Bad DCU Fixable, soldering problem 1 HV Shorted to CF Frame FIXED!! 2 with >20 mA Bias Current 1 leaky pinhole 1 scratched sensor

7 UCSB ARCS Testing Issues
Need to confirm cuts on TEC modules Getting some confusion between 1SO/2SO Have not produced TEC R6 modules in a year Still need to validate ARCS 8.0 Currently using ARCS 7.2bugfix

8 UCSB LT Testing Status Weekly Cumulative Pass Fail % Pass L12pu 0.00%
Pass Fail % Pass L12pu 0.00% L12pd L12su L12sd L34p 84 100.00% L56p 59 318 R5N 1 40 R5S R6 45 88 R7 Total 105 530