RAD Evolution Workshop Outcome
RAD WS DEC 2018, Brussels, Belgium
2
RAD Evolution Workshop Outcome Detailed evolutions - Operational and technical
RAD WS DEC 2018, Brussels, Belgium
3
RAD Evolution Workshop
Content and Structure Appendix 3: Change as from RAD1902 splitting the Column “City Pair” into 3 new Columns. Appendix 5: Further adaptation and publication of the general limits via new xls file, for non-B2B users Appendix 7: Continuation of adaptation of data between RAD and CACD. Next report expected in FEB 2019. Restriction Structure: CFSPs and AOs are encourage to report difficulties on restrictions definition to be structurally resolved; Reminded that introduction of FRA via RAD is based on volume, point and border referenced restrictions. CFSPs were requested by AOs to accelerate implementation on volume based restrictions in their systems. Re-consideration, simplification and harmonisation of the restrictions structure rules and expresssion definition of the restrictions Restriction Content / Length: CFSPs and AOs are encourage to report difficulties in case of complicated and long restrictions to be structurally resolved; addressing of those issues to progress through regular RAD CDM processes. Dependent Applicability: CFSPs and AOs are encourage to report difficulties in case of “problematic” multiple or single dependent applicability in order to be structurally resolved. addressing of those issues to progress through regular RAD CDM processes. Re-consideration of the processes related to RAD restrictions defined as “mandatory when available” pushing flights into areas made available for civil use through UUP and resulting in a loss of the ATFM slot RFL Use and Processing: Consider the inclusion of a “flight type” definition that would not be subject to RAD restrictions; Reference to any issue related to RFL explanation - NM Flight Planning Requirements - Guidelines.
4
RAD Evolution Workshop
Suggestions for possible NM System improvements “Vertical” Dependent Applicability Purpose is to accommodate FUA and FRA adequately and handle FL sensitive dependent applicability based on multiple FL activations. Restrictions on intermediate SID/STAR connecting point Currently no way of encoding such connecting point to be only available for certain traffic routeing only. Group Points Group of points concept, similar to the way in which group of airfields is done in RAD; Possibility of several significant points to be classified into a single group; Currently considered by (in old CR) as part of TV model. Possible incorporation in RAD requires discussions and approval by RMG. Point Usage (non-FRA) Ability to automatically encode points dependent upon their usage. RAD Analyses Tool Analysis of RAD restrictions - to have a means of gauging the ‘hit rate’ of various RAD restrictions to assess whether they are still required (it may be this is already possible). All suggestions will be further considered and studied by the NM and relevant reports will be provided.
5
RAD Evolution Workshop
Other Suggestions RAD Improvement / Reduction - be possible by ANSPs in case of appropriate and improved flight planning (no turns, sectors…..). PTRs - if are optional for the AOs to be considered they shall only be applied after validation of the trajectory. RAD WS be followed up by a series of smaller workshops to develop best-practices and blue prints between RAD experts from ANSPs and algorithm specialists from CFSPs under facilitation of NM.
6
RAD Evolution Workshop Outcome Process Evolutions
RAD WS DEC 2018, Brussels, Belgium
7
Outcome Re-define the CDM process on the acceptance of proposed RAD restrictions in accordance with the justification, assessment results and objective goal of the proposed RAD restrictions; Assess the need, the effect and traffic impacted by the request to have new RAD restrictions introduced; Define a new process for the “Last minute” changes: Perform assessment of the proposed RAD restrictions and subsequently proposed “Last minute” changes; Allow exemptions in the “Last minute” changes eligibility criteria. NM/ States / FABs / ANSPs to establish a post-ops process to continuously re-evaluate the existing RAD restrictions and if additional justification not provided to ask for that RAD restrictions suppression; Propose simplification of the RAD restrictions: Collapse multiple RAD restrictions in one network RAD restrictions with the same effect; Evaluate and propose suppression of RAD restrictions constantly not respected on ATC; Define network oriented RAD restrictions together with concerned States / FABs / ANSPs, after the provision of clear objective goal and justification for RAD restriction implementation; Propose structural airspace changes to eliminate the need for RAD restrictions; The final content of any amendment to the RAD shall be positively agreed between the NM RAD Team and State / FAB / ANSP concerned; Define the requirements and gradually implement an enhanced pre-validation process supported by automation to allow better validation and flight planning processes; The new RAD CDM processes defined shall take fully into account the new technical support being implemented through as from 2019; Define enhanced promulgation processes for the RAD relaxation; Aim to define and implement the new RAD process through the NM CDM Processes before the Summer 2019.