Download presentation
Presentation is loading. Please wait.
Published byLina Viklund Modified over 5 years ago
1
Tony Mathis Luke Buchanan Tasha Hart Carter McCall
Totally Tubular Tony Mathis Luke Buchanan Tasha Hart Carter McCall
2
Design Time Materials Construction The Building Process
3
Cost Most wood used was scrap Dowel rods, 5 ($.92 each = $5.03)
PVC ($5.32) Rubber tubing, 25 ft ($15.49) 5 ft scrap Duct tape ($3.95) BB’s (compliments of Ace Hardware) Total cost $29.79 Cost
4
Start A B End Critical Points
5
Equations Conservation of Energy D = VT A: v = 11.08 ft/s
PEgrav = KE vf = √vx2 + vy2 mgh = ½ mvf2 D = VT A: v = ft/s B: v = ft/s Bottom: v = ft/s Equations
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.