Presentation is loading. Please wait.

Presentation is loading. Please wait.

March 2006 Denver Meeting Slides

Similar presentations


Presentation on theme: "March 2006 Denver Meeting Slides"— Presentation transcript:

1 March 2006 Denver Meeting Slides
Doc.: IEEE /0xxxr0 March 2005 March 2006 March 2006 Denver Meeting Slides Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

2 Welcome to TGT Evaluation of 802.11 Wireless Performance
Doc.: IEEE /0xxxr0 March 2005 March 2006 Welcome to TGT Evaluation of Wireless Performance Charles R. Wright Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

3 IEEE-SA Standards Board Bylaws on Patents in Standards
Doc.: IEEE /0xxxr0 March 2005 March 2006 IEEE-SA Standards Board Bylaws on Patents in Standards 6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Approved by IEEE-SA Standards Board – December 2002, Reaffirmed May 2005 Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

4 Inappropriate Topics for IEEE WG/TG/SG Meetings
Doc.: IEEE /0xxxr0 March 2005 March 2006 Inappropriate Topics for IEEE WG/TG/SG Meetings Don’t discuss the validity/essentiality of patents/patent claims Don’t discuss the cost of specific patent use Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at Approved by IEEE-SA Standards Board – March 2003 (Revised January 2006) Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

5 Attendance Recording -802.11
March 2006 Attendance Recording A sign-in sheet will be located at the Concierge desk Each member must sign-in “once” (1) per day, between the hours of 07:30 and 17:30 local time Participants must “sign” their name in the appropriate place and state of attendance for that day in terms of AM1/AM2, PM1/PM2, EV1 (if an evening meeting exists) Only “sign-in” for yourself, do NOT “sign-in” for and other participate. Attendance will be checked against other 802 groups. Those found abusing the honor system will loose ALL credit for that day. These sheets are provided daily. If you don’t sign up during the “regular sign-in” hours, you will NOT be given credit for that day. Charles R. Wright, Azimuth Systems, Inc.

6 Sign In!!! A Friendly Reminder…
Doc.: IEEE /0xxxr0 March 2005 March 2006 A Friendly Reminder… The attendance server on 802wirelessworld will not be in operation this week Attendance will be recorded on a sign-in sheet Between 8 AM and 5 PM, go to the registration desk and sign the sheet and indicate how many of the meetings that day you did or will attend Do this once a day Sign In!!! Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

7 March 2006 Be Aware… Do not leave your laptop or personal items unattended in meeting rooms Charles R. Wright, Azimuth Systems, Inc.

8 One Other Item – Document Server
March 2006 One Other Item – Document Server There’s a local server that mirrors the documents on that’s updated every 15 minutes ftp:// /var/ftp/11 Please use this server for downloads to conserve bandwidth on our link to the outside world For document submissions, use the web interface on as per usual Charles R. Wright, Azimuth Systems, Inc.

9 Meeting Objectives Reaffirm (or replace) chair and TG officers
March 2006 Meeting Objectives Reaffirm (or replace) chair and TG officers Elect a permanent secretary.  Must be a voting member of Technical presentations and proposals: Metrics and methodologies RF testing environments Device operating environments Device configuration Application performance Definitions Review of Draft 0.6; approval of any changes Review of timeline and procedure for getting to Letter Ballot Charles R. Wright, Azimuth Systems, Inc.

10 Progress Since Waikoloa
March 2006 Progress Since Waikoloa Editor incorporated approved proposals into the draft to create D0.6 Two telecons held Discussion on “Permissible Error Margins”, in doc11-06/255r0 Announcement of expected presentations and proposals for March meeting Charles R. Wright, Azimuth Systems, Inc.

11 Proposed Agenda for Denver Meetings
Doc.: IEEE /0xxxr0 March 2005 March 2006 Proposed Agenda for Denver Meetings Chair comments Appoint secretary Approval of agenda Approve minutes 11-06/0143r0 – Waikoloa 11-06/0368r1 – Feb 23 Telecon Reaffirmation of TG officers / Nomination of competing candidates Vote to reaffirm Chair Call for editor nominations / reaffirmation of editor Call for presentations 11-06/0333r0, “Introduction to Measurement Uncertainty,” M. Foegelle (45 min) 11-06/0005r2, “Test Methodology Measuring Loss Delay and Jitter”, C. Trecker (draft text: 11-06/0004r3, 45 min) 11-06/0321r0 “GED video over wireless methodology”, R. Fernald (45 min) 11-06/0322r0, “Overview of Video Use Cases”, R. Fernald (30 min) 11-06/0131r1, “Traceable OTA performance testing”, M. Foegelle (30 min) 11-06/0376r1, “Power Consumption Change Requests”, C. Warren (Wed, 45 min) 11-06/0416r1, “OTA Sampling Test”, P. Visuri (proposal 11-06/0160r0, Wed or Thurs) 11-06/0384r0 “Coexistence of two overlapping BSSs in adjacent channels”, N. Sharma (draft text: 11-06/0383r0, Wed) 11-06/0324r0, “Proposed Theoretical Throughput Limits Section Structure”, L. Green (Wed or later) Presentations in Item 6 as they are ready Process discussions Editor’s report Discussion: “What is the purpose of ?” Who is the intended audience? Review and update, if necessary, slide 11 from 11-05/912r2 (expected proposals) Review of published T timeline (see New Business Future telecons Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

12 March 2006 Motion 1 Move that TGT recommends Charles Wright as TGT chair to Stuart Kerry IEEE WG chair Moved/Second: D. Ward/M. Foegelle Unanimous consent Charles R. Wright, Azimuth Systems, Inc.

13 Meeting Schedule for this Week
March 2006 Meeting Schedule for this Week Monday Tuesday Wednesday Thursday 8:00 TGT ad hoc TGT TGT TGT 9:30 TGT TGT Closing Business 11:00 12:30 Lunch 1:30 3:30 4:00 TGT 6:00 Dinner 7:30 Tutorials TGT Tutorials 9:30 Charles R. Wright, Azimuth Systems, Inc.

14 March 2006 Ad Hoc Presentations These are the presentations discussed in TGT’s Monday morning ad hoc meeting 11-06/0376r0, “Power Consumption Change Requests”, C. Warren 11-05/1044r1, “Introductory and Supplemental Recommended Practice Text ”, D. Ward 11-06/0131r1, “Traceable OTA performance testing”, M. Foegelle (updated; for discussion) 11-06/0416r0, “OTA Sampling Test”, P. Visuri Charles R. Wright, Azimuth Systems, Inc.

15 TGT Plan Of Record As discussed in Garden Grove session…
March 2006 TGT Plan Of Record As discussed in Garden Grove session… Used as input to the TG milestones table Step 1 complete after March meeting All important pieces in place at this time TG internal review to start after March meeting Comments resolved in May meeting New draft created and circulated before July meeting Additional comment resolution during July Plan to vote on going to LB at July meeting Update the timeline for LB in July 2006 All other dates in milestones table will be updated accordingly Charles R. Wright, Azimuth Systems, Inc.

16 TGT Standards Process Milestones
March 2006 TGT Standards Process Milestones Dates are updated from our discussion on Tuesday We are here 2005 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1st LB 1st Recirc 2nd Recirc 2006 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1st SB SB Recirc 2007 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec WG/SEC approval REVCOM approval 2008 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Charles R. Wright, Azimuth Systems, Inc.

17 March 2006 New Business Possible telecons if we follow our current “every two weeks” schedule: 23 March 2006 6 April 2006 20 April 2006 4 May 2006 Discussion of work to be done on teleconferences Charles R. Wright, Azimuth Systems, Inc.

18 Telecons between March and May 802.11 meetings
Motion to empower TGT to hold telecons Time: 12 noon Eastern (US) time Duration: 1 hour Dates: Moved/second: Charles R. Wright, Azimuth Systems, Inc.

19 March 2006 Backup Information Charles R. Wright, Azimuth Systems, Inc.

20 TGT Approved Document List
March 2006 TGT Approved Document List 11-04/1553r2, “Guidelines for TGT Formal Metric and Methodology Proposals” 11-05/912r3, “TGT Process Document” Charles R. Wright, Azimuth Systems, Inc.

21 Teleconference Info Date: Thursdays
March 2006 Teleconference Info Date: Thursdays Time: 12 Noon Eastern time (no matter what the daylight savings time status) Duration: 1 hour Phone #  International: Passcode: Next: TBD Charles R. Wright, Azimuth Systems, Inc.

22 March 2006 Reflector reflectors: Requires membership to send to it Getting on the reflectors Instructions are contained in every reflector posting for customizing your reflector experience (including unsubscribing) rules require all TG communication to be through reflector Charles R. Wright, Azimuth Systems, Inc.

23 References for 802.11 Newcomers (1 of 2)
March 2006 References for Newcomers (1 of 2) Web site: Document server: Sign up for an account No need to be an member to get an account Once logged in, “join” : Click on “ WLAN WG” on left In center window, choose to become a new member Click again on “ WLAN WG” An additional subitem called “Documents” will be revealed – click on it You’ve reached the document server! Charles R. Wright, Azimuth Systems, Inc.

24 References for 802.11 Newcomers (2 of 2)
March 2006 References for Newcomers (2 of 2) Document numbering scheme WG-YY-NNNN-RR-gggg-English-document-title.ext WG = 802 working group number, e.g. “11” as in YY = two digits of year NNNN = document number RR = document revision number gggg = group to which the document pertains Example: t-jan-2006-waikoloa-meeting-slides.ppt Charles R. Wright, Azimuth Systems, Inc.


Download ppt "March 2006 Denver Meeting Slides"

Similar presentations


Ads by Google