Download presentation
Presentation is loading. Please wait.
Published byNichole Apling Modified over 10 years ago
1
BHEL : PSSR : MRPL Site Shri. W V K Krishna Shankar Director (IS&P)
Shri. Atul Sobti Director (Power) Visited MRPL Site on
2
Warm Welcome to Director/Power by GM / Site
3
Warm Welcome to Director/IS &P by GM / IC PSSR
6
Briefing on CPP, Progress and Equipment in Operation - by GM / Site
7
Briefing by GM /IC PSSR
8
Briefing on GT Flow Divider issue
9
CW Pump house area
10
Switch Gear Area
11
Control Room
12
STG Hall
13
Cooling Tower, Switch Gear Building & STG Hall
14
Utility Boilers and Pipe racks
15
HRSG Area
16
Fuel Oil Control Station
17
Review
18
Review
19
Director / Power Addressing Site Employees
20
Director/IS & P with Site Employees
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.