1 Dominion Power Play Use the power of simulation to predict the future
Design presentation CS 410 –Black Team October 20th 2016

2 Team Black Team Mentor: ’Max’ Siangchokyoo Addy Alago David Hescheen
Jack Elder Nathapon ‘Max’ Siangchokyoo Nick Benfield Ryan Rusnak Stephanie Zeil Trai Corte Team Mentor: ’Max’ Siangchokyoo

3 Dominion Power The Customer
Dominion power needs a better way to analyze decisions and their impacts on specific regions before those decisions need to be made The system will be used by: Dominion Power decision makers Analysts Players Our solution can be adapted for other industries with similar needs

4 Decisions need to be made in response to events affecting regional power plants.
Results of decisions can take years Adjusting decisions a reactive, instead of proactive process Wrong decisions cost time and money The Problem

5 Current Process Flow

6 $ Decisions come with different perils $ Other Challenges Takes Time
Testing Difficult Results can take decades Live environment testing impossible $ Costly $ Mistakes Expensive and hard to reverse Can Be Disasterous Manpower Fear Not Requires an entire team to research problem A solution is possible

7 To Build or Not To Build $1080 $5098 $6108
Gas $5098 Coal $6108 Nuclear Cost of building a power plant per MW Decisions about building or retiring a plant can be influenced by many factors and have long term rippling effects. A plant not built today may put you behind tomorrow. A plant not decomissioned today may become unprofitable.

8 Dominion Power Play Our Solution Web Based Simulator
Web Based Simulator Users will play the role of CEO. Players presented with realistic scenarios. Decisions on resource allocations will affect simulated outcomes. Outcomes will be studied and applied to real life scenarios.

9 Our Solution Players will be given scenarios: New legislation passed
Cost of resources (gas, coal) spikes or drops Incoming natural disasters Others can be added to simulations

10 Our Solution Planning phase
Players prepare for the scenario by making changes to power plants in various regions Variables such as production levels, operating hours, retirement date etc can be set Informative read only variables presented to player to aid planning

11 Simulation Phase Variables are pushed to the simulation engine
Outcomes are simulated and presented to player New data and new simulations fed into Web interface for next round

12 Learning from simulations
Reporting Learning from simulations Analytics Reporting and Analytics will be available to show different metrics and outcomes with each simulation. Best outcomes can be studied and implemented in production environments without spending time and energy. Potential pitfalls can be avoided by seeing what issues are simulated. 76% Plant Uptime 89% Plant Uptime 2013 2014 2015 2016 2017 2018

13 Our Process Flow

14 Major Functional Components
Simulation Engine models and simulates power plant behavior. SQL server pushes and pulls game variables to and from front end and simulation engine Web based front end houses the game Players can play on mobile or pc browser Analysts can view reporting and outcomes based on simulations.

15 We are building something truly unique
Our Competition: Power Play Cities Skylines Sim City Series Kairosoft Story Games Customizable scenarios Yes No Easily modified Focus on one industry Able to model decision making Reporting

16 What Won’t Our Solution Do?
Limitations What Won’t Our Solution Do? Will not analyze results. Will not provide real time gameplay Will not model without user input

17 Thanks for Watching