Presentation is loading. Please wait.

Presentation is loading. Please wait.

ACTIVITY 4: FINAL BATTLE CULMINATING ACTIVITY

Similar presentations


Presentation on theme: "ACTIVITY 4: FINAL BATTLE CULMINATING ACTIVITY"— Presentation transcript:

1 ACTIVITY 4: FINAL BATTLE CULMINATING ACTIVITY
TOC Time! ACTIVITY 4: FINAL BATTLE CULMINATING ACTIVITY

2

3

4 Steps 1. Group yourselves according to your site visit group (5 groups) for this final activity. 2. Using role play as the learning method, each group will be given a case where the participants will portray LGU planning units roles. 3. Each group will be assigned an activity area where they will set-up an ”actual feel” environment. “ Design my place

5 Scenario 1 1st LDC Meeting FY 2018 – 2019
Description Consideration Cast Description: The group was invited to give a presentation to the LDC for its approval.  As members of the TWG, the task is to support the TWG results of the project. Short attention span of the LDC Interests of the LDC members Mayor’s priority project is solid waste management Not all LDC members are familiar with the project. Councilor requests for technical input on formulating development controls considering resilient design. Mayor Committee Councilor 1

6 Scenario 2 1st Public Consultation Series
Description Consideration Cast The group will be conducting a public consultation of the specific project. Different sectors are attending the consultation. Based on the climate assessment, several barangays were identified as high risk area. 1 Barangay was selected as a pilot site for resilience building. Possibility that the project will displace 100 households. Options include: On site retrofitting, resettlement Non-government organizations People’s Organizations Brgy. Captain

7 Scenario 3 Investors Description Consideration Cast
The group will be presenting a project proposal for funding to a two potential investors. There is an investor interested to build commercial development, and is new to climate resiliency but is willing to explore. His first option and keen interest is in building in the Eastern part of the city facing the Pacific. Investor Technical Staff (Climate Denier) International Consultant

8 Scenario 4 Developer Description Consideration Cast
The group proposes a climate resilient affordable housing. The developer wants to build a business as usual low cost housing and is not convinced that climate resilient housing is not cost efficient. Initial available land is an area identified to be at risk to Sea Level Rise Developer Architect

9 Scenario 5 DBM Budget Call
Description Consideration Cast The agency was called to present their budget for FY 2019 – 2020. The agency also considered to implement climate resilient programs. The DBM has available funds but initially allocated to business as usual hard infra to support the Build! Build! Build! DBM Undersecretary BBB Representative

10 Group presentations: 15 minutes max per group Target audience: Different Audiences You have 2 hours to prepare! USE PRESENTATIONS AS REFERENCE, ESPECIALLY: Day 2: Climate Change and Resilience Principles and Case Studies of Resilient Urban Design Learning Styles and Methodologies Day 3: Site Visit Guide Site Visit Guide Form training-on-resilient-urban-design- module-1/

11 Thank you! Good luck.


Download ppt "ACTIVITY 4: FINAL BATTLE CULMINATING ACTIVITY"

Similar presentations


Ads by Google