Download presentation
Presentation is loading. Please wait.
Published byEmiliano Rosamond Modified over 10 years ago
1
ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010
2
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 2 Alstom Nuclear Equipment At the heart of the Nuclear Power Plant Nuclear islandTurbine islandBalance of Plant
3
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 3 Alstom Nuclear Equipment Fitting all type of reactors EPR VVER1200 AP1000 700 MWe PHWR (India) Kerena
4
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 4 Alstom Nuclear Equipment Best Performance out of Any Nuclear Reactor Oskarshamn 3 LP Rotor Chooz first ARABELLE Best efficiency with single flow expansion: -Proven combined HP/IP module. -Continuous R&D developments. Excellent Reliability: -300,000 Operating Hours experience. Solid welded rotor: -Best resistance to Stress Corrosion Cracking. -Secured supply chain. Mature family of last stage blades: -Oskarshamn 3 Last stage Blade (1750 mm) is world longest operating blade since 2009. Design for low maintenance cost: -Reliability and durability proven by 300,000 Operating Hours experience.
5
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 5 Key Player of Nuclear Renaissance Main contracts in Execution (New and Retrofit) China Ling Ao 3+4 Taishan 1+2 Hongyanhe 1-4 Ningde Fuqing Fangjiashan 1 + 2 South Korea Ulchin 1+2 USA Calvert Cliffs 3 North Anna 1+2 Surry 1+2 Quad Cities 1+2 Dresden 2+3 Peach Bottom 2+3 San Onofre 2+3 Fort Calhoun South Africa Koeberg 1+2 France Flamanville 3 Mexico Laguna Verde 1+2 Sweden Ringhals 4 Finland Olkiluoto 1+2 Switzerland Leibstadt Legend New Equipment Retrofit
6
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 6 Main contracts in Execution Flamanville 3, 1750 MWe in France Turbine Island excluding Civil: Power Conversion systems, transportation and site erection. Other Equipment such as: Circulating Water pumps, Emergency Generator, etc. Lifting of an LP heater at siteWorld largest ARABELLE TM steam turbine March 2010April 2010
7
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 7 Main contracts in Execution Quad Cities 2, 900 MWe Retrofit in USA Supply of 3 Low Pressure Turbine inner block retrofits and full Installation. MWe output uplift guarantee provided. Installation completed within the 24 day, turbine synchronized on 18th April 2010. Quad Cities 2 is the first of six Nuclear retrofit projects with Exelon, the last being completed in 2014, each designed to increase the efficiency, reliability and capacity of each power plant. Steam Turbine rotor, Chattanooga facility
8
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 8 A worldwide organization A global business footprint … Wuhan: Engineering Execution center Local supply chain development Chattanooga: Execution center Calvert Cliffs 3 project management Levallois: Execution centre Nuclear systems integration R&D St Petersburg: AAEM execution center Tendering support and local supply chain development India: Execution center Local sourcing
9
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 9 A worldwide organization …relying on a global manufacturing network Rotating Machines Static Equipment Service Factories Other Factories Rotating Machines: Beijing, Belfort, Bexbach, Birr, Elblag (Foundry), Elblag (Turbines), Chattanooga (turbines), Mannheim, Morelia, Wroclaw. Static Equipment: Budapest, Brno, Durgapur, Neumark, Sizhou, Setubal, Surabaya, Wuhan, Chattanooga (boilers). Service Factories: Berlin, Richmond, Bucharest T, Bucharest G, Rugby, Sesto, Gatineau, Stafford, Karlovac. Other factories: Shahabad, Wellsville, Concordia, Kassel, Vinhedo, Osaka, Shanghai.
10
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 10 A worldwide organization Alstom is extending its nuclear activity Alstom Technology has been selected by NPCIL and BHEL for the new 700 MW Indian designed PHWR Nuclear power plant program. Alstom is working with Areva on the EPR project Jaitapur for NPCIL, to supply Conventional Island. Manufacturing and engineering of large equipment for nuclear, gas new and retrofit in Chattanooga Operational in June 2010 Worlds largest balancing facility Easy access to 80% of existing or planned US nuclear power plants 350.000 m 2 under a single roof INDIA USA
11
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 11 Alstoms nuclear activity in Russia License to manufacture turbine - generator equipment based on ARABELLE technology 49%51% Alstom set-up Joint Venture AAEM with AEM, Rosatom affiliate.
12
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 12 Good progress in Technology Transfer to AAEM JV. Alstom is ready for the next steps: -To develop manufacturing in Russia and execute projects based on VVER1200 reactors. Alstoms nuclear activity in Russia
13
www.alstom.com
14
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Презентация - 01/01/2007 - P 14 AAEM manufacturing facility in Podolsk Renovation project Workshop space: ~ 53,000 sq. m. Office space: ~ 15,000 sq.m. Employees: ~ 840. Special machines and tools: 43 pcs. Heat treatment equipment: 14 pcs. Welding equipment: 29 pcs. Blanking equipment: 6 pcs. Automatic lines: 2 pcs. Stands and benches: 51 pcs.
15
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 15 Transfer and adaptation of technical information is up and running at the JV A common information space has been established to join the Engineering Centre in St.Petersburg and the manufacturing facility in Podolsk. The system for project information exchange (PIRS) allows AAEMs integration into the common framework of data flow between Alstom and its partners. St. PetersburgPodolsk Manufacturing Engineering Centre Secure VPN channel between Alstom and AAEM Suppliers Customers AEM ALSTOM
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.