1 Swaken Port

2 Receiving bitumen From Vessel

3 Receiving Pipeline At Allied Africa's Terminal

4 Storage Tanks (Total Capacity 2,500 M Tons)
T1= 2,,000 M TON T2= 500 M TON

5 Loading Rack 2No.Loading Arms Weight Bridge

6 (2) No. Boilers

7 Inlet Heating Valves Outlet Heating Valves

8 100 No. Of Bitu – trainers each of 20 M TON Capacity

9 Bitumen Pumps + Mobile Crane
2 No. Pumps

10 Loading The Bitumen Into The Bitu-tainers

11 2 No. 200 KVA Generators + (SGM) Software

12 The Added Value Of Using Bulk Packed Bitumen

13 Asphalt Plant

14 The use of Bulk Bitumen ensures a homogenous Source Of Bitumen

15 How Much Does It Cost ? What Is The Solution ???

16 The Solution Is the Use Of Bulk bitumen … Think Green When The Situation Is Black

17 The use of Bulk Bitumen Reduces the operation cost by eliminating the Waste in Barrels (5 – 10 %).

18 The use of Bulk Bitumen Reduces the operation cost by eliminating the need of the loader

19 The use of Bulk Bitumen Reduces the operation cost by eliminating the casual labors

20 The use of Bulk Bitumen Eliminates the Fire Hazard In The Boiler, Bitumen Tank, Gas oil Tank & The Asphalt Plant

21 The use of Bulk Bitumen Reduces the Operation Cost & Storage Area

22 The use of Bulk Bitumen Is more Saver To The Staff & Friendly To The Environment
Pollution