Presentation is loading. Please wait.

Presentation is loading. Please wait.

Enrollment & Capacity Analysis

Similar presentations


Presentation on theme: "Enrollment & Capacity Analysis"— Presentation transcript:

1 Enrollment & Capacity Analysis
Joe Serna Charter School Houston Elementary School Victor Elementary School Lockeford Elementary School June 19, 2018 Board Meeting

2 Sept 29, 2017 vs May 25, 2018 Serna Houston Victor Lockeford
9/29/2017 5/25/2018 9/29/2017 5/25/2018 9/29/2017 5/25/2018 9/29/2017 5/25/2018 Totals K Page 1

3 Projected Available Capacity, 2019-2020
Serna Houston Victor Lockeford Enr Available Enr Available Enr Available Enr Available Capacity Capacity Capacity Capacity Totals K Page 2

4 Serna – Houston Class Load Breakdown
Level FT Serna Houston k k k Level FT Serna Houston Page 3

5 Serna – Houston Classroom Breakdown
Under the current assumptions (final slide) and room assignments, the Houston site would require - …three more classrooms to adequately house both programs …additional bathrooms (approximately 2) …one water tank for fire response Page 4

6 Serna – Houston Considerations
A small Houston Special Day program would need to be incorporated into another site’s program Growth or decline will affect these calculations Kinder projections are up, especially at Lockeford Page 5

7 Serna – Houston Calculations
For , enrollment at the four sites is projected to be 1,225 students For , available capacity at the four sites is projected to be 288 openings 54% of the projected available capacity is expected to be in the 4th – 6th grade levels Page 6

8 Current Assumptions Analysis targets the 2019-2020 school year
Current kinder projections are used for both kinder and 1st grade levels in the school year All other levels are projected at 100% cohort survival in the school year Available capacity is calculated as LEA contract load less projected class enrollment Page 7


Download ppt "Enrollment & Capacity Analysis"

Similar presentations


Ads by Google