Presentation is loading. Please wait.

Presentation is loading. Please wait.

District Five Upcoming Projects

Similar presentations


Presentation on theme: "District Five Upcoming Projects"— Presentation transcript:

1 District Five Upcoming Projects

2 Structures Estimated Value
AA MD 648AA Over Cattail Creek 500K – 1M CA MD 261 Over Fishing Creek 15M – 30M SM MD 5 Over Eastern Branch 2.5M – 5M

3 Intersection Improvements Estimated Value
AA MD 2 at Earleigh Heights Road/Magothy Bridge Road M – 10M SM MD 4 from MD 235 to Patuxent Boulevard 2.5M – 5M AA MD 175 at Reece Road and Mapes Road – BRAC 10M – 15M AA MD 2 at Owensville Sudley Road M – 5M AA MD 2 at MD M – 2.5M CA MD 2 at Mount Harmony Road M – 5M AA MD 2 at Harwood Drive M – 2.5M

4 System Presevation Estimated Value
AA MD 2 at MD 214 Concrete Overlay/Full-Depth Replacement 500K – 1M XY Area-Wide Resurfacing in Northern Anne Arundel County M - 10M XY Area-Wide Resurfacing in Southern Anne Arundel County 5M – 10M XY Area-Wide Resurfacing in Calvert County M – 10M XY Area-Wide Resurfacing in Charles County M – 10M XY Area-Wide Resurfacing in St. Mary’s County M – 10M

5 Pedestrian and Bicycle Improvements Estimated Value
AA MD 424 from MD 3 to MD M – 2.5M XX District-Wide Sidewalk Retrofits M – 5M Traffic Barrier AA MD 10 from MD 177 to MD M – 2.5M XY District-Wide Traffic Barrier Improvements K – 1M Drainage Improvements AX MD 32 from Sappington Station Road to MD M – 2.5M AA I-97 Southbound West of East-West Boulevard 500K – 1M

6 Signalization and Lighting Estimated Value
XY District-Wide Signalization M – 5M XY District-Wide Lighting M – 2.5M AA Lighting at I-695 Interchanges with I-895 and MD M – 2.5M Environmental AT Tree Planting at Various Locations in Anne Arundel M – 2.5M and Charles Counties AA MD 665 Broad Creek Stream Restoration/Wetlands M – 2.5M Replacement


Download ppt "District Five Upcoming Projects"

Similar presentations


Ads by Google