Hybrid & Module Testing Status
Week of 11/14-11/18
2
UCSB Hybrid Testing Status
3
UCSB ARCS Testing Status
4
UCSB ARCS Testing Failures
This Week 1 CMN Cumulative 12 with too much current 2 after backplane bonding 4 due to residue on sensors 1 already repaired 2 with >2% bad channels 1 with bad DCU Repairable 1 with CF frame shorted to HV 1 with bad Dec. Mode chip 1 with bad Peak Mode chip 1 with chip with too low noise 1 with bad chip 1 with funny LED test 1 with chip out of synch 1 failed on rod 1 CMN
5
UCSB ARCS Testing Results
2323 Total Tested 2296 Grade A 4 Grade B 23 Grade F This week: 7.5 of channels bad (0.026%) Total Production: 588 of channels bad (0.041%)
6
UCSB ARCS Testing Results
Total Production: 588 of channels bad (0.041%) This week: 7.5 of channels bad (0.026%)
7
UCSB Backplane Testing
8
UCSB LT Testing Status Failed module has too much current