High Level Operations Transition Timeline
XXXXXX Production Operations 5 to 3 yrs before CoP May 2016 00
2
High Level Operations Transition Timeline
Anonymous Tool provides overview of the timeline of an asset as it prepares for decommissioning.
3
- 5 - 4 - 3 - 2 - 1 + 1 + 2 + 3 + 4 + 5 Establish Decommissioning Task Force CoP Engineering & Supporting Studies (inc. surveys) CoP Plan / DP Preparation & Approval CoP / DP Submitted Sourcing Equip & Contractors P&A Planning / Rig Refurbishment Platform Well P&A (inc. Conductor Removal) Subsea Well P&A Fixed Facilities CoP / Decom Prep Making Safe, Cleaning, Engineering Down & Removal Preparations Facilities Down Manned Topsides Removal Jacket Removal Floating Facilities Making Safe & Removal Prep Facilities Taken Off-station Subsea Facilities Making Safe & Cleaning Subsea Removal Site Remediation / Surveys Onshore Disposal Note: Schedule provided is indicative of activities and sequence of events, actual durations will vary depending on facilities design and contracting strategy. Tool XXXX - High Level Operations Transition Timeline
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.