Download presentation
Presentation is loading. Please wait.
1
讓價值流『精實』 消除浪費
2
過量生產
3
節拍時間 Takt time
4
Flow 服務業: 單一窗口
5
SUPERMARKET: PULL SYSTEM
CSUN - Prof. David Shternberg MSE595LM - Lean Manufacturing SUPERMARKET: PULL SYSTEM 服務業: 小批次處理、 巡迴服務 PURPOSE: Controls production at supplying process without trying to schedule. Controls production between flows Supplying Process A Customer B PRODUCT Supermarket Production KANBAN Withdrawal KANBAN 1) CUSTOMER WITHDRAWAL Kanbans trigger the movement of parts PRODUCTION Kanbans trigger the production of parts. NOTE: The withdrawal kanban resides in the “process cell” and is given to the supermarket. The production Kanban resides in the supermarket and is given to the next upstream production process.
6
Supermarket 相關符號
7
Schedule Only One Point: 基準節拍工程
CSUN - Prof. David Shternberg MSE595LM - Lean Manufacturing Schedule Only One Point: 基準節拍工程 If pull systems schedule upstream process we can try to schedule only one point in the value stream - Pacemaker No supermarkets downstream of the schedule point (except finished goods) schedule schedule
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.