SEQUENCE OF OPERATIONS
BASE PRIMER (PAINT) ASSEMBLY PAINT ELECTRIC FINAL DETAIL Tubular Cut Primer Application Paint Application Tubbing Detail Caulking Leveling Panels, Liners and Insulation Installation Cables Labeling Tag weld Isolators Installation Electrical Components Shipping Cover (Triplay wood) Welding Aluminum plaques Installation Connection Cleaning Frame weld Rack Tests Shrink Wrap Roof weld Door Installation Caulking Inspection Accepted Area Accepted all processes LOAD RELEASE WARE- HOUSE LOAD Chk012-aluminumplate Chk013-Doors Chk001-bas-gral Chk002-bas- tolerancias Chk003-prim-gral Chk004-ens-gral Chk005-ens-unionsm Chk007-ens-door Chk009-pin-gral Chk008-ele-gral Chk010-dfin-gral Chk011- Load-gral PC-01-Warehouse PC-02-Base PC-03-Primer PC-04-Assembly PC-05-Paint PC-06-Electric PC-07-Final Detail PC-08-Load Components Inspection Rain Test