1
A B Hz Hz Rocky Reach Unit 1 on Frequency Control BA – CFC target=60
Not active – Manual BA – CFC target=60 Not active - Manual Rocky Reach Unit 1 on Frequency Control
2
A B Hz Hz BA – CFC target=60 Not active – Manual BA – CFC target=60
Rocky Reach Unit 1 on Frequency Control Remove: Rocky Reach Unit 1 on Frequency Control
3
A B 1. Place BA to “CNI” Hz 2. Place unit(s) in “Auto”
To maintain tie at “0”. A B Auto 0 MW BA – CFC target=60 Not active – Manual BA – CFC target=60 Not active - Manual Now we will place the BA AGC control to CNI and unit 4 to “Auto” and it will control the tie line flow to the schedule (currently 0). BA – CNI Active - Auto
4
Schedule 100 MW from one BA to another
Schedule 100 MW from one BA to another. As Sherrill indicated, you cannot enter a negative schedule. Schedules Are “from” and “to”.
5
A B Hz 1. Place BA to “CNI” 100 MW BA – CFC target=60
Not active – Manual Now we will place the BA AGC control to CNI and unit 4 to “Auto” and it will control the tie line flow to the schedule (currently 0). BA – CNI Active - Auto Now with the 100MW Schedule in place, the Units in “auto” with control Tie line flows to 100MW (directional).
6
c
7
c