Presentation is loading. Please wait.

Presentation is loading. Please wait.

Classroom Renovation Project Summer 2013. RB 130 COMPLETE RENOVATION AFTER BEFORE.

Similar presentations


Presentation on theme: "Classroom Renovation Project Summer 2013. RB 130 COMPLETE RENOVATION AFTER BEFORE."— Presentation transcript:

1 Classroom Renovation Project Summer 2013

2 RB 130 COMPLETE RENOVATION AFTER BEFORE

3 RB 140 COMPLETE RENOVATION AFTERBEFORE

4 PAINT HM 230 AFTER BEFORE

5 PAINT HM 260 AFTER BEFORE

6 PAINT GL 137 AFTERBEFORE

7 PAINT GL 139 AFTERBEFORE

8 PAINT GL 165 AFTERBEFORE

9 PAINT GL 166 AFTER BEFORE

10 MISCELLANEOUS PROJECTS

11 EC 3 rd FLOOR STUDENT STUDY SPACE AFTER BEFORE

12 EC 3 rd FLOOR STUDENT STUDY SPACE AFTER

13 EC 3 rd FLOOR STUDENT STUDY SPACE AFTERBEFORE

14 VETERANS TOWER AFTERBEFORE

15 VETERANS TOWER AFTERBEFORE

16 VETERANS TOWER AFTERBEFORE

17 VETERANS TOWER AFTERBEFORE

18 GL HUB AFTERBEFORE

19 GL HUB AFTERBEFORE

20 GL HUB AFTERBEFORE

21 GL HUB AFTERBEFORE

22 GL HUB AFTER

23 FURNITURE REUPHOLSTERING

24 BIX SEATING BEFORE

25 BIX SEATING BEFOREAFTER

26 TV SEATING BEFORE

27 TV SEATING BEFORE AFTER

28 4 th FLOOR CHAIRS BEFORE

29 4 th FLOOR CHAIRS AFTER BEFORE

30 SEATS HM 260 AFTER BEFORE

31 PC 2 nd FLOOR LOBBY CHAIRS AFTER BEFORE

32 SEAT CUSHIONS AC1 264 AND 265 AFTER BEFORE


Download ppt "Classroom Renovation Project Summer 2013. RB 130 COMPLETE RENOVATION AFTER BEFORE."

Similar presentations


Ads by Google