Download presentation
Presentation is loading. Please wait.
1
A connectionist model in action
(from Stillings et al. (1995)) Input layer 7 -4 7 -4 Hidden Layer -3 7 7 7 Output layer -10
2
The XOR Function Input 1 Input 2 Output 1 7 -4 7 -4 -3 7 7 7 -10
3
The XOR Function Input 1 Input 2 Output 1 7 -4 7 -4 -3 7 7 7 -10
4
The XOR Function Input 1 Input 2 Output 1 -3 7 7 -3
5
The XOR Function Input 1 Input 2 Output 1 1 7 -4 7 -4 -3 7 7 7 -10
6
The XOR Function Input 1 Input 2 Output 1 1 7 -4 4 3 7 7 -10
7
The XOR Function Input 1 Input 2 Output 1 1 7 -4 4 3 7 7 4
8
The XOR Function Input 1 Input 2 Output 1 1 -4 7 4 3 7 7 4
9
The XOR Function Input 1 Input 2 Output 1 1 1 7 -4 7 -4 -3 7 7 7 -10
10
The XOR Function Input 1 Input 2 Output 1 1 1 7 -4 7 -4 11 7 7 7 -10
11
The XOR Function Input 1 Input 2 Output 1 1 1 7 -4 7 -4 11 -1 7 7 -10
12
The XOR Function Input 1 Input 2 Output 1 1 1 7 -4 7 -4 11 -1 7 7 -10
13
The XOR Function Input 1 Input 2 Output 1 1 1 7 -4 7 -4 11 -1 7 -3
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.