Download presentation
Presentation is loading. Please wait.
1
Presented by Donald Norris, City Engineer
Downtown Aspen Falls Presented by Donald Norris, City Engineer
2
Revitalization Goals Improve the overall look of the downtown area
Increase pedestrian traffic through downtown Reinforce the image of downtown as a shopping destination
3
Current Projects Sidewalk repair Move all utility lines underground
Hanging garden baskets placed on light poles Bike lane repainted
4
Upcoming Projects Repainting city owned posts
Work with business owners on building updates and upgrades Sidewalk improvement project
5
Downtown Aspen Falls Revitalization Effort
Contact Donald Norris, City Engineer (805) 555 – 1021
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.