Download presentation
Presentation is loading. Please wait.
Published bySeverin Hjelle Modified over 5 years ago
1
IEEE 802.15 Working Group for Wireless Personal Area Networks (WPAN™)
May 2002 doc.: IEEE /181r0 May 2002 IEEE Working Group for Wireless Personal Area Networks (WPAN™) TG1 Opening Report May 2002 Sydney, AU Ian Gifford, Consultant Ian Gifford, Consultant
2
Contents Summary Session #18/Sydney Overview Project Planning Status
May 2002 Contents Summary Session #18/Sydney Overview Objectives (see summary) Submissions Project Planning Status Next Meeting Status Drafting History Ian Gifford, Consultant
3
May 2002 doc.: IEEE /181r0 May 2002 Summary [1 of 2] Task Group 1 (TG1) derived a draft standard from the Bluetooth™ specification under IEEE PAR After Session #17 project members attended the 20Mar02 IEEE-SA StdBd Committee Meetings (RevCom) in Piscataway, NJ USA. The debate was long but in the end the project was approved. The RevCom and IEEE-SA Standards Board conditionally approved on 21Mar02 the IEEE Std ® based adding editorial text that points to Subject: P Disapproval Notification ----- Original Message ----- From: To: Cc: Sent: Friday, December 07, :23 PM 7 December 2001 Ian Gifford 23 Kelshill Road Chelmsford, MA cc: Paul Nikolich, C/LM Liaison Angela Ortiz, Program Manager Yvette Ho Sang, Manager IEEE Standards Publishing Gary Robinson, RevCom Mentor RE: NEW P /D1.0.1 (C/LM) Standard for Information Technology - Telecommunications and Information Exchange Between Systems - Local and Metropolitan Area Networks - Specific Requirements - Part 15.1: Wireless Medium Access Control (MAC) and Physical Layer (PHY) Specifications for Wireless Personal Area Networks (WPANs) Dear Ian: I must inform you that P was disapproved because the Sponsor must insure that the scope stated in the PAR is consistent with the scope of the document. The Sponsor shall conduct a recirculation ballot with proper technical rebuttals to unresolved negative comments. Gary Robinson will be the RevCom mentor to the Sponsor. Please contact me if you have any questions. Sincerely, ********************************************************************************** David L. Ringle RevCom Administrator IEEE Standards Activities Dept. 445 Hoes Lane PH: PO Box FX: Piscataway, NJ Ian Gifford, Consultant Ian Gifford, Consultant
4
Summary [2 of 2] During the Mar02/May02 between-session-period:
Review IEEE Std ® proof copy, ETA 31May02 Review IEC/ISO JTC 1 status and next steps Review /D1.1 Maintenance, Interpretations, BSIG Errata, etc. IEEE Std ® Handbook TG1 is in hibernation and is not planning to meet. Have fun . Ian Gifford, Consultant
5
Session #18/Sydney – Submissions
May 2002 doc.: IEEE /181r0 May 2002 Session #18/Sydney – Submissions 02/181r0* WG TG1 Opening Report Mar02 Gifford D1.1 or IEEE Std ® review cycle submissions can be found here: *Was the minutes doc number but was not needed as the TG1 is not meeting. Ian Gifford, Consultant Ian Gifford, Consultant
6
Conditional Approval Summary
May 2002 doc.: IEEE /181r0 May 2002 Conditional Approval Summary The IEEE Std was conditionally approved as a new standard by the IEEE-SA Standards Board on 21 March Editorial discussion must be added to the Introduction of the standard that points to the P draft recommended practice for coexistence. The following is the currently planned editorial discussion that will be added: "There is a body of generally available industry information quantifying the level of over-the-air coexistence between and Additional information may be obtained from the Draft P Recommended Practice on Coexistence which deals specifically with this issue." Note: We will also add a phrase that: a) Gives an expected date for the approved document and b) Explains that the approved standard would supersede the draft. See note below. From: To: Cc: Subject: P Conditional Approval Notification Date: Friday, March 22, :37 PM 22 March 2002 Ian Gifford 23 Kelshill Road Chelmsford, MA cc: Paul Nikolich, C/LM Liaison Angela Ortiz, Program Manager Yvette Ho Sang, Manager IEEE Standards Publishing RE: NEW P /D1.0.1 (C/LM) Standard for Information Technology - Telecommunications and Information Exchange Between Systems - Local and Metropolitan Area Networks - Specific Requirements - Part 15.1: Wireless Medium Access Control (MAC) and Physical Layer (PHY) Specifications for Wireless Personal Area Networks (WPANs) Dear Ian: I am pleased to inform you that P was conditionally approved as a new standard by the IEEE-SA Standards Board on 21 March Editorial discussion must be added to the Introduction of the standard that points to the P draft recommended practice for coexistence. Please note that conditional approval is valid untill the submittal deadline for the next quarterly meeting. In this case, until 3 May 2002. A copy of the document will be forwarded to the Standards Publications Department. The editor assigned to work on the project will contact you. Please contact me if you have any questions prior to speaking with your editor. Sincerely, ********************************************************************************** David L. Ringle RevCom Administrator IEEE Standards Activities Dept. 445 Hoes Lane PH: PO Box FX: Piscataway, NJ Ian Gifford, Consultant Ian Gifford, Consultant
7
Final Approval Summary
May 2002 doc.: IEEE /181r0 May 2002 Final Approval Summary The IEEE Std was approved as a new standard by the IEEE-SA Standards Board on 15Apr02. “I am pleased to inform you that P was approved as a new standard by the IEEE-SA Standards Board on 15 April A copy of the document will be forwarded to the Standards Publications Department. The editor assigned to work on the project will contact you.” Dave Ringle, RevCom Administrator See note below. From: To: Cc: Subject: P Final Approval Notification Date: Monday, April 15, :43 AM 15 April 2002 Ian Gifford 23 Kelshill Road Chelmsford, MA cc: Paul Nikolich, C/LM Liaison Angela Ortiz, Program Manager Yvette Ho Sang, Manager IEEE Standards Publishing Michael Fischer, Negative Balloter Robert O'Hara, Negative Balloter RE: NEW P /D1.0.1 (C/LM) Standard for Information Technology - Telecommunications and Information Exchange Between Systems - Local and Metropolitan Area Networks - Specific Requirements - Part 15.1: Wireless Medium Access Control (MAC) and Physical Layer (PHY) Specifications for Wireless Personal Area Networks (WPANs) Dear Ian: I am pleased to inform you that P was approved as a new standard by the IEEE-SA Standards Board on 15 April A copy of the document will be forwarded to the Standards Publications Department. The editor assigned to work on the project will contact you. All IEEE standards shall be updated within five years of the date of publication. If the standard is not revised, reaffirmed, or withdrawn within five years, the sponsor will be notified that it will be submitted to the Standards Board for administrative withdrawal. It should be noted that any negative balloters have the right to appeal. Please consult the following web pages for information on this principle: Please contact me if you have any questions prior to speaking with your editor. Sincerely, ********************************************************************************** David L. Ringle RevCom Administrator IEEE Standards Activities Dept. 445 Hoes Lane PH: PO Box FX: Piscataway, NJ Ian Gifford, Consultant Ian Gifford, Consultant
8
IEEE Std 802.15.1-2002® Review Cycle
May 2002 doc.: IEEE /181r0 May 2002 IEEE Std ® Review Cycle The following TG1 Editors have continued into the review cycle: Chatschik Bisdikian Michael T. Camp David E. Cypher Mike D. McInnis Tom Siep Fujio Watanabe As of 10May02 all Clauses and Annexes have been reviewed by IEEE-SA Project Editor. As of 12May02 the TG1 Editors have reviewed the editorial comments and here is the document return status: Clauses done Annexes A-D done Annex E-H pending Ian Gifford, Consultant Ian Gifford, Consultant
9
IEEE 802.15.1 Final Project Plan
May 2002 IEEE Final Project Plan Jul99 Initial Discussion on Proposals. Nov99 Initial draft ready for WG ballot. Jan00 First Ballot complete, second ballot kicked off. Mar01 Jul01 Draft ready for IEEE sponsor ballot. Sep01 Nov01 Dec01 Mar02 Approval by IEEE Standards Board 15Apr02 Final Approval by IEEE Standards Board Project Target & 802 Sponsor Expectation Conditionally approved on 21Mar02 Ian Gifford, Consultant
10
Tentative Needs for Jul02 Plenary
May 2002 Tentative Needs for Jul02 Plenary 8-11May02 (5 Days) 0 People TG1 leadership is not planning to attend the Jul02 Plenary. Ian Gifford, Consultant
11
May 2002 IEEE Future Meetings July 8-11, 2002 Vancouver, BC Canada, Hyatt Regency, 802 Plenary Meeting. September 9-13, 2002, Hyatt Regency Monterey, Interim Meeting. November 11-14, 2002 Koloa, HI USA, Hyatt Regency Kauai, 802 Plenary Meeting. More Info: Ian Gifford, Consultant
12
May 2002 doc.: IEEE /181r0 May 2002 Drafting History Draft Tom Siep 100% Draft Tom Siep 100% Draft Tom Siep 100% Draft Tom Siep 100% 283 Pages Draft Tom Siep 100% Draft BT-IEEE Editorial Working Group 331 Pages 1 Chief Editor/6 Technical Editors 6 Bluetooth Promoter Company Reviewers w/ internal help ~300 Comments Draft BT-IEEE Editorial Working Group 308 Pages 1013 Comments Draft 0.7 – Tom Siep 100% 617 Pages Draft IEEE Task Group 1 Technical Editors 803 Pages 1 Chief Editor/11 Technical Editors Draft IEEE Task Group 1 Technical Editors 773 Pages 412 Comments Draft – Jennifer Longman, IEEE-SA Project Editor 100% Draft IEEE Task Group 1 Technical Editors Draft IEEE Task Group 1 Technical Editors 1130 Pages 1 Chief Editor/7 Technical Editors 376 comments Draft IEEE Task Group 1 Technical Editors 1159 Pages 1 Chief Editor/7 Technical Editors 71 comments Draft IEEE Task Group 1 Technical Editors 1 Chief Editor/3 Technical Editors 60 comments Draft IEEE Task Group 1 Technical Editors 1165 Pages 0 comments Draft IEEE Task Group 1 Technical Editors 1 Project Editor From: To: "Ian Gifford" Subject: Annex G for review Date: Wednesday, May 08, :12 AM Ian, Attached are the files for Annex G. This will now complete the body of the document. I will work on the compare document for Annex E and get it to you asap if I can get it to work. Thanks. Jenn (See attached file: Annex G compare.fm)(See attached file: Annex G for review.pdf)(See attached file: Annex G Summary.fm) Jennifer M. Longman Project Editor, IEEE Standards Activities PH: ; FX: The Institute of Electrical and Electronics Engineers, Inc. 445 Hoes Lane, PO Box 1331, Piscataway, NJ USA **************************************************************************** The IEEE-SA Project Editor will provide /D1.1, FrameMaker source after review cycle; this month (see note) Ian Gifford, Consultant Ian Gifford, Consultant
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.