Presentation is loading. Please wait.

Presentation is loading. Please wait.

PN UNC AMR Topic Workgroup

Similar presentations


Presentation on theme: "PN UNC AMR Topic Workgroup"— Presentation transcript:

1 PN UNC AMR Topic Workgroup
Meeting 19 – Transfer Scenarios

2 Existing Change of Shipper Transfer Read Timeline - all Regimes
Date Read loaded for D & GT notifies Close out for Transfer read Period for Shipper to submit replacement transfer read GT Est. on D GT notifies of estimate Period for Shipper to submit transfer read Shipper window for Transfer read date D- 5 D D+1 D+5 D+10 D+15 Key: NDM Regime DM Regime DME Regime

3 Change in Shipper, no change in Regime Agreed for AMR Processes 1 & 2
Transfer Date (D) Shipper A Shipper B Transfer Read obtained & loaded by the Outgoing Shipper Close out for transfer read Process 2 Read loaded Process 1 Read loaded Daily Reads Received Daily Reads Received 10.00 am D- 5 D D+1 D+5

4 Change in Shipper, no change in Regime Agreed for AMR Process 3 & 4
Transfer Date (D) Shipper A Shipper B Close out for transfer read Transfer Read obtained & loaded by the Outgoing Shipper Process 3: Batch of reads may be submitted from D+7 Process 4: Periodic read may be submitted from D+7 D- 5 D D+1 D+5 D+7 D+10

5 Change in Regime & Shipper – NDM to AMR.
Transfer Date (D) NDM AMR Close out for transfer read Transfer Read obtained & loaded by the Outgoing Shipper? Daily reads or periodic read received from AMR Current NDM Transfer Read Submission Window Current NDM Transfer Read Window D- 5 D D+1 D+5 D+10

6 Change in Regime & Shipper – AMR to NDM.
Transfer Date (D) AMR NDM Close out for transfer read? Transfer Read obtained & loaded by the Outgoing Shipper Daily Reads or periodic read received NDM Transfer Read Submission Window NDM Transfer Read Window D D- 5 D+1 D+5 D+10 D+15


Download ppt "PN UNC AMR Topic Workgroup"

Similar presentations


Ads by Google