Presentation is loading. Please wait.

Presentation is loading. Please wait.

Selected Priority Projects

Similar presentations


Presentation on theme: "Selected Priority Projects"— Presentation transcript:

1 Selected Priority Projects
12 projects presented + Priority Project n° 0: Support Activities 12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich

2 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich
Adopted Criteria Difficult choice ! Adopted Criteria: Fitting with COSMO strategies and goals Priority list defined within each WG FTE already available/allocated (the project is already well addressed and does not impact too much on the amount of resources to be found) A real benefit of the activities coming from being organized within a project Number of selected projects at the upper limit! Considering this is the Trial Year it is better to give more possibility to choice 12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich

3 Proposed Priority Projects
0. Support Activities Retrievas for nudging: 1dVar for satellite radiances as a pilot project SIR: Sequential Importance Resampling filter Retrievas for nudging: Humidity profiles from GPS tomography Further development of LM_Z Further development of the Runge Kutta method Investigation of implicit methods for LM UTCS: Towards Unified Turbulence-Shallow Convection Scheme Tackle deficiencies in precipitation forecasts Indirect parameter measurement by the model (parameter assimilation) Development of Short range ensemble Advanced Interpretation of Lm output Implementation of an Extended Common Verification Suite - Conditional Verification. 12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich

4 Selected Priority Projects
0. Support Activities Retrievas for nudging: 1dVar for satellite radiances as a pilot project SIR: Sequential Importance Resampling filter Further development of LM_Z Further development of the Runge Kutta method UTCS: Towards Unified Turbulence-Shallow Convection Scheme Tackle deficiencies in precipitation forecasts Development of Short range ensemble Advanced Interpretation of Lm output Implementation of an Extended Common Verification Suite - Conditional Verification. 12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich

5 Selected Priority Projects
0. Support Activities Retrievas for nudging: 1dVar for satellite radiances as a pilot project SIR: Sequential Importance Resampling filter Further development of LM_Z Further development of the Runge Kutta method UTCS: Towards Unified Turbulence-Shallow Convection Scheme Tackle deficiencies in precipitation forecasts Development of Short range ensemble Advanced Interpretation of Lm output Implementation of an Extended Common Verification Suite - Conditional Verification. 12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich

6 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich
REQUIRED FTE 2006 ALREADY AVAILABLE TO BE FOUND Support Activities 1 0.5 Retrievas for nudging: 1dVar for satellite radiances 2 1.5 SIR: Sequential Importance Resampling filter 2.5 Further development of LM_Z Further development of the Runge Kutta method UTCS: Towards Unified Turbulence-Shallow Convection Scheme 4 3.5 Tackle deficiencies in precipitation forecasts Development of Short range ensemble Advanced Interpretation of Lm output Implementation of an Extended Common Verification Suite - Conditional Verification 12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich

7 Template of Top Priority Project Plan
Project leader: General description: Aim of the project and general description Scientific background: Possible criticity: Description of project tasks T1 Technical and scientific description Table to describe details of the tasks: T n 12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich

8 Template of Top Priority Project Plan
task Suggested scientists (optional) % FTE per year start milestones date 1 40 Jan. xxx June 2 ……… n 12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich

9 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich
14th STC meeting DWD, 13 June 2005 STC defines COSMO strategy SAC (WP Coordinators + SPM) defines a preliminary list of projects fitting COSMO strategy General Meeting parallel sessions: collection of proposals and fine- tuning of projects SAC defines a priority list to be submitted to the decisions of STC STC selects a limited (one-digit) numbers of “top priority projects” WP coordinators identify Project Leaders Project Leaders prepare a detailed Project description and a clear project plan (project activities, human resources, milestones) STC gives the final approval of the projects STC members assigns human resources to the projects 12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich


Download ppt "Selected Priority Projects"

Similar presentations


Ads by Google