Presentation is loading. Please wait.

Presentation is loading. Please wait.

New SFDC Campaign Sequence –March, 2019

Similar presentations


Presentation on theme: "New SFDC Campaign Sequence –March, 2019"— Presentation transcript:

1 New SFDC Campaign Sequence –March, 2019
4 s over 20 days with Call Task Message Summary: #1 (Day 1): CenturyLink Fiber is available in your building. When can we meet? #2 (Day 6): Following up on #1. CenturyLink Fiber+ turns your business into a digital powerhouse. Let’s schedule time to talk CALL TASK DAY 7 #3 (Day 11): Follow up on s # Are you the right contact? With CenturyLink Fiber+ you’ll have secure reliable internet connection…. #4 (Day 16): Follow up on #1-3. Are you sure you aren’t interested

2 MTU Cold Call Sequence Email #1 (Day 1)

3 MTU Cold Call Sequence Email #3 (Day 11)


Download ppt "New SFDC Campaign Sequence –March, 2019"

Similar presentations


Ads by Google