Download presentation
Presentation is loading. Please wait.
Published byBeryl Edwards Modified over 5 years ago
1
SOS-III Workshop 20-21 February, 2006 OCG Working Group on Interoperability and Testing
Anthony Wiles ETSI PTCC On behalf of Hans Van der Veer Lucent and Board Champion for Interoperability
2
OCG-IOP ad hoc Group Interoperability and Testing is an ETSI strategic topic for 2006 Hans Van der Veer (Lucent) is Board Champion ETSI OCG –IOP is Operational Co-ordination Group (TB Chairs)Ad hoc group on Interoperability (and testing) Chair is Hans Van der Veer First meeting held 23 January 2006 The group’s primary role is to provide a horizontal co-ordination structure for issues related to interoperability. Focus/coordinate activities on interoperability issues towards the ETSI Technical Organisation Act as a steering group for the OCG interoperability STFs Ensure alignment regarding related activities of PTCC E.g., IOP test specifications and validation activities Ensure closer alignment of PlugtestTM events with the ongoing standards development work within ETSI Meetings will be by audio conference Physical meetings in conjunction with OCG meetings Contact if you wish to participate
3
Main Actions for 2006 White paper on Interoperability (and testing)
Compile feedback from TBs and other organisations IMS/NGN testbed at ETSI Support OCG-IOP ad hoc Group and STFs Expand PTCC services (main task IOP issues) Strengthen alignment of PlugtestTM with Technical Bodies Ensure update of ETSI IOP methodologies Produce long-term action plan (based on recommendations from the white paper)
4
OCG-IOP Specialist Task Forces
The ETSI Board has proposed two (project) activities to improve the strategic positioning of ETSI in the field of interoperability (B53(05)29 ) STFs will be run under OCG-IOP ad hoc Group Proposal 1: Development/improvement of 'Standards Engineering' process Proposal 2: Trial Implementation of a Standards Validation Service These projects will be run as two ETSI STFs May be combined as one STF (to be decided at B56) Looking for experts to participate in these STFs
5
Goal of the STFs Review and update ETSI Technical Working Procedures with respect to standardisation in a multi-SDO context and with a view to interoperability Demonstrate validation of standards by pragmatic means such as Walk-throughs Testbed activities Testing Work with MTS, PTCC and Plugtests to define IOT procedures Define standards feedback process Will be based on NGN case study Will make use of testbeds, where possible
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.