Download presentation
Presentation is loading. Please wait.
Published byMilton James Modified over 5 years ago
1
WG11 Snapshot November ‘10 Date: 2010-Nov-07 Authors: Name Company
doc.: IEEE /1193r0 November 2010 WG11 Snapshot November ‘10 Date: 2010-Nov-07 Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
2
November 2010 doc.: IEEE /1193r0 November 2010 WG11 Task Group TGp PAR expires Dec 31, not needed, published TGs PAR expires Dec 31, Extension approved by EC; Extension approved by SASB TGu PAR expires Dec 31, Extension approved by EC Extension pending approval by SASB TGv PAR expires Dec 31, Extension approved by EC Extension pending approval by SASB Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
3
WG11 Task & Study Group Officers - Roster
November 2010 doc.: IEEE /1193r0 November 2010 WG11 Task & Study Group Officers - Roster Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro P Lee Armstrong none Wayne Fisher Susan Dickey S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt U Necati Canpolat Dave Stephenson V Emily Qi -OPEN- Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, James Yee Carlos Cordeiro AE Henry Ptasinski AF Richard Kennedy Zhou Lan AH Dave Halasz –pro tem Dave Halasz SG FIA Hiroshi Mano Marc Emmelmann SC WNG Clint Chaplin Ad hoc ARC Dave Bagby JTC1 Andrew Myles REG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)
4
WG11 Task & Study Group Officers - Nov adjustments
November 2010 doc.: IEEE /1193r0 November 2010 WG11 Task & Study Group Officers - Nov adjustments Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt U none Necati Canpolat Dave Stephenson V Emily Qi -OPEN- Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, James Yee Carlos Cordeiro AE Henry Ptasinski AF Richard Kennedy Zhou Lan AH Dave Halasz –pro tem Dave Halasz SG FIA Hiroshi Mano Marc Emmelmann SC WNG Clint Chaplin Ad hoc ARC Dave Bagby JTC1 Andrew Myles REG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)
5
IEEE 802.11 Standards Pipeline
November 2010 doc.: IEEE /1193r0 November 2010 IEEE Standards Pipeline 802.11z TDLS 802.11s Mesh MAC 802.11r Fast Roam e QoS 802.11u WIEN 802.11k RRM h DFS & TPC 802.11aa Video Transport 802.11V Network Management 802.11Y Contention Based Protocol FIA i Security Smart Grid f Inter AP 802.11ae QoS Mgmt Frm 802.11p WAVE 802.11mb Maintenance ah a 54 Mbps 5GHz 802.11n High Throughput (>100 Mbps) 802.11af TVWS g 54 Mbps 2.4GHz 802.11ac VHT 5GHz 802.11W Management Frame Security 802.11ad VHT 60GHz 802.11b (’99) 11 Mbps 2.4GHz PHY Published Amendment Discussion Topics Study groups TG without draft WG Letter Ballot Sponsor Ballot Published Standard Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
6
WG11 Editor Abstract / Agenda – Nov 2010
July 2007 March 2010 November 2010 doc.: IEEE /0990r1 doc.: IEEE /1193r0 November 2010 WG11 Editor Abstract / Agenda – Nov 2010 Roll Call / Contacts / Reflector Go round table and get brief status report Numbering Alignment process – its great importance to all our drafts Amendment Ordering / ANA Status / Draft Snapshots Framemaker v9 transition January 2011 RevCom preparation process discussion ANA Report Slide 6 Slide 6 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 6 Page 6 Terry Cole (AMD) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
7
WNG SC – November 2010 Review of objectives
May 2008 November 2010 doc.: IEEE /1193r0 November 2010 WNG SC – November 2010 Review of objectives Longer Range Lower Data-Rate Low Energy ( xx-0wng-l-cubed-longer-range-lower-data-rate-low-energy.pptx) – Bill Carney Digital RF Transceiver to Meet the Needs of Emerging Spectrum ( xx-0wng) – Alex Reznik Location Awareness ( wng-location-awareness-discussion.ppt) – Jim Lansford Review Objectives for January 2011 Meeting Bruce Kraemer (Marvell) 7 Page 7 Bruce Kraemer (Marvell)
8
802.11 ARC SC meets “as needed” Topics for November 802 Plenary
May 2008 doc.: IEEE /0547r0 doc.: IEEE /1193r0 November 2010 IEEE ARC SC – November 2010 ARC SC meets “as needed” Topics for November 802 Plenary 802.1 architecture document revision effort Goal is to complete comment resolution Dave not here- supporting from office Slide 8 David Bagby (Calypso Ventures, Inc) Bruce Kraemer (Marvell) Page 8 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
9
TGmb - November 2010 Initial Sponsor Ballot on Draft 6.0 closed 5 Nov
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /1193r0 November 2010 TGmb - November 2010 Initial Sponsor Ballot on Draft 6.0 closed 5 Nov Pool 186, 122 affirmative – 87%, 18 Disapprove – 13%, 9 Abstain – 6% 454 comments This meeting Comment resolution, work towards initial recirculation SB Update timeline Agenda in Plan to incorporate published amendments (11p, 11z, 11v, 11u) during SB process Slide 9 Bruce Kraemer (Marvell) Page 9 John Doe, Some Company Bruce Kraemer (Marvell)
10
IEEE 802.11s Mesh Networking - Nov
September 2009 November 2009 November 2010 doc.: IEEE xxx doc.: IEEE /0547r0 doc.: IEEE /1193r0 November 2010 IEEE s Mesh Networking - Nov TGs Draft 7.0 passed its first Sponsor Ballot (closing November 1) with 95.3% approval and 307comments. Draft 7.0 did not include comments from the professional editing by IEEE staff. These will be rolled in when available. Draft 7.0 is based on REVmb 4.0; rebasing on REVmb 6.0 is planned; TGs draft agenda is in submission 11-10/1250r0. The focus is on comment resolution Tentatively, we expect a first recirculation to happen shortly after the ad hoc in Munich editorial technical Disapprove comments 68 22% 100 33% Approve comments 118 38% 21 7% Slide 10 Slide 10 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 10 Page 10 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
11
IEEE 802.11u – November 2010 Creation of revised draft D13.0
May 2008 doc.: IEEE /0547r0 doc.: IEEE /1193r0 November 2010 IEEE u – November 2010 Creation of revised draft D13.0 ANA issues Editorial typos in primitive and MIB names Re-circulation Ballot Schedule 2 re-circulation ballots to resolve any comments Request additional conditional RevCom Approval July 2010 approval expires this week Present report at ExCom on Friday Revise timelines Plans for January 2011 Slide 11 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 11 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
12
TGv – November 2010 Current Status
doc.: IEEE /1193r0 November 2010 TGv – November 2010 Current Status 9th Recirculation Ballot on D16.0 currently underway to correct ANA assignment issues; closes Nov 14. One session this week, Renew RevCom conditional approval from ExCom Revcom Approval target moves from Dec 2010 to Jan/Feb 2011 Eighth Recirculation SB (closed ) 161 in ballot pool, 141/3/7 Y/N/A : 97.9% approve, 2% disapprove 1355 comments received, 1344 Technical, 5 Editorial, 6 General (1045 comments expand/duplicate 7 prior ballot comments) Comments in Sixth Recirculation SB (closed ) results 161 in ballot pool, 140/3/7 Y/N/A : 97.9% approve, 2% disapprove 1361 comments received, 1348 Technical, 8 Editorial, 5 General (1023 comments expand/duplicate 7 prior ballot comments) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
13
November 2010 IEEE z – November 2010 The final z recirculation sponsor ballot on draft D13.0 passed with 97% approval rate 126 yes, 3 no, 8 abstain 0 comments received Approved by RevCom & SASB meeting in September Published October 24 There are no items of business for TGz during the Dallas meeting Done !! Slide 13 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
14
IEEE 802.11aa – Dallas, Texas Goals:
November 2010 May 2008 doc.: IEEE /xxxxr0 doc.: IEEE /1193r0 November 2010 IEEE aa – Dallas, Texas Goals: Joint meeting with 802.1AVB Resolve remaining LB164 comments and approve corresponding resolutions Start recirculation letter ballot Opening report in document 10/1225r0 Slide 14 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 14 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
15
November 2010 November 2010 doc.: IEEE /1193r0 doc.: IEEE /xxxxr0 November 2010 November 2010 IEEE ac – November 2010 Continue with Ad Hoc group meetings and straw polls Continue with the development of the Specification Framework document (11-09/0992r15). Technical contributions Agenda in document 11-10/1214r0 Slide 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
16
TGad – Nov Meeting Goals
November 2010 doc.: IEEE /1193r0 November 2010 TGad – Nov Meeting Goals Comment Resolution on LB168 CWPAN liaison report Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
17
TGae November 2010 Summary Find a TG Secretary
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /1193r0 November 2010 TGae November 2010 Summary Find a TG Secretary LB 169 Comment Resolution Received 460 comments – 152 Editorial; 308 Technical. Revise plan of record. Slide 17 Bruce Kraemer (Marvell) John Doe, Some Company Page 17 John Doe, Some Company Bruce Kraemer (Marvell)
18
TGaf – Meeting Goals November 2010
Review teleconference progress Review FCC and impact on the draft Vote to remove unwanted text from the draft Make necessary edits Create draft d1.0 Request to start first WG Letter Ballot Plan for January Interim in Los Angeles Slide 18 Slide 18 Bruce Kraemer (Marvell)
19
IEEE 802.11ah Snapshot Officer elections
Month Year November 2010 doc.: IEEE /0587r0 doc.: IEEE /1193r0 November 2010 November 2010 IEEE ah Snapshot Officer elections Submissions to help draft text Use cases etc Submissions for baseline draft 0.1 Slide 19 David Halasz, OakTree Wireless Bruce Kraemer (Marvell) Page 19 David Halasz, Aclara Bruce Kraemer (Marvell)
20
IEEE 802.11 FIA SG – Dallas , November 2010
May 2008 doc.: IEEE /1193r0 doc.: IEEE /xxxxr0 November 2010 November 2010 IEEE FIA SG – Dallas , November 2010 Goals for the Dallas Meeting: Respond to 802 plenary review comments Comments received by 5 pm Tuesday, November 9 Response due by 5 pm Wednesday, November 10 Submissions to prepare for Task Group Plan for January Interim and Teleconference Slide 20 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 20 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
21
November 2010 May 2008 doc.: IEEE /0547r0 doc.: IEEE /1193r0 November 2010 IEEE JTC1 ad hoc – Nov 2010 The agenda items that will be addressed this week are: Approval of minutes from previous meetings Review goals of JTC1 ad hoc Review status of Sponsor Ballot drafts sent to ISO/IEC JTC1/SC6 Review WAPI status in ISO/IEC JTC1/SC6 Review latest WAPI draft Possibly develop liaison to respond comments related to NP Review results of recent SC6 meeting agenda Including discussions of proposed replacements for , security, 802.1X, 802.1AE Discuss plans to submit to ISO/IEC JTC1/SC6 In context of SC6 review of :2005 Discuss any other JTC1/SC6 liaison matters Slide 21 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 21 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
22
Regulatory Ad Hoc Committee Meeting Goals November 2010
The regulatory summaries Regulatory issues status The FCC TVWS rulings The FCC FNPRM and NOI on E911 for IP-enabled services SE43 Update EN revision update; actions in TG11 FCC 5 GHz rules changes update including P2P decision Critical issues actions Change needed to TVWS spectrum mask Peer-to-Peer regulatory issues in the 5 GHz bands Slide 22 Bruce Kraemer (Marvell)
23
Smart Grid – November 2010 Tuesday pm1
doc.: IEEE /1193r0 November 2010 Smart Grid – November 2010 Tuesday pm1 Revision of Wireless Technology Matrix used in NIST Smart Grid PAP#2 Report. Tues eve & Thursday am1 UK Consultation Update of activities in P2030 Open SG ITU Focus Group Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)
24
July - September 9 ballots completed November 2010
Bruce Kraemer (Marvell)
25
Recent Ballots September - November 6 completed November 2010
Bruce Kraemer (Marvell)
26
P802.11ad – Initial WG Ballot November 2010
Ballot #168 was a 30 day Working Group technical recirculation Ballot asking the question "Should P802.11ad D1.0 be forwarded to Sponsor Ballot?". The Official results are: Ballot Opening Date: Friday September 24, 2010 - 23:59 ET Ballot Closing Date: Sunday October 24, 2010 - 23:59 ET RESPONSE RATE: 278 eligible people are in this ballot group. 163 affirmative votes 24 negative votes 26 abstention votes === 213 votes received = 76.6% valid returns = 12.2% valid abstentions APPROVAL RATE: 163 affirmative votes = % affirmative 24 total negative votes = % negative Motion passes. There were 1187 comments received. Bruce Kraemer (Marvell)
27
P802.11rev/mb – Initial Sponsor Ballot
November 2010 P802.11rev/mb – Initial Sponsor Ballot The initial IEEE P802.11REVmb ( roll-up revision) 45 day Sponsor Ballot asked the question “Should P802.11REVmb Draft 6.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date: Tuesday September 21, 2010 - 23:59 ET Ballot Closing Date: Friday November 05, 2010 - 23:59 ET RESPONSE RATE: 186 eligible people are in this ballot group. 122 affirmative votes 18 negative votes with comments 1 negative vote without comments 9 abstention votes ======= 150 votes received = 80.6 % valid returns = 6.0% valid abstentions APPROVAL RATE: 122 affirmative votes = 87.1 % affirmative 18 total negative votes = 12.9 % negative The motion passes. There were 450 comments received Bruce Kraemer (Marvell)
28
P802.11s – Initial Sponsor Ballot
November 2010 The initial IEEE P802.11s (MESH networking) 30 day Sponsor Ballot asked the question “Should P802.11s Draft 7.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date: Saturday October 02, 2010 - 23:59 ET Ballot Closing Date: Monday November 01, 2010 - 23:59 ET RESPONSE RATE: 184 eligible people are in this ballot group. 123 affirmative votes 6 negative votes with comments 0 negative votes without comments 10 abstention votes ======= 139 votes received = 75.5 % valid returns = 7.2% valid abstentions APPROVAL RATE: 123 affirmative votes = 95.3 % affirmative 15 total negative votes = 4.7 % negative The motion passes. There were 307 comments received. Bruce Kraemer (Marvell)
29
P802.11ae – Initial WG Ballot November 2010
Ballot #169 was an initial 30 day Working Group technical Ballot asking the question "Should P802.11ae D1.0 be forwarded to Sponsor Ballot?". The Official results are: Ballot Opening Date: Monday September 27, 2010 - 23:59 ET Ballot Closing Date: Wednesday October 27, 2010 - 23:59 ET RESPONSES: 278 eligible people are in this ballot group. 136 affirmative votes 33 negative votes 39 abstention votes === 208 votes received = 74.8% valid returns = 18.8% valid abstentions APPROVAL RATE: 136 affirmative votes = % affirmative 33 total negative votes = % negative Motion passes. There were 454 comments received. Bruce Kraemer (Marvell)
30
P802.11v – 7th Sponsor Recirculation
November 2010 P802.11v – 7th Sponsor Recirculation The 15 day, seventh recirculation Sponsor Ballot for IEEE P802.11v (Wireless Network Management) asked the question “Should P802.11v Draft 15.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date: Wednesday September 15, 2010 - 23:59 ET Ballot Closing Date: Thursday September 30, 2010 - 23:59 ET RESPONSES: 161 eligible people are in this ballot group. 140 affirmative votes 3 negative votes with comments 0 negative votes without comments 7 abstention votes ======= 150 votes received = 93.2% valid returns = % valid abstentions APPROVAL RATE: 140 affirmative votes = 97.9 % affirmative 3 total negative votes = 2.1 % negative This ballot has met the 75% returned ballot ratio requirement This ballot has met the <30% abstain ratio requirement The Motion passes. There were 1361 comments received Bruce Kraemer (Marvell)
31
P802.11v – 8th Sponsor Recirculation
November 2010 The 10 day, eighth recirculation Sponsor Ballot for IEEE P802.11v (Wireless Network Management) asked the question “Should P802.11v Draft 15.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date: Friday October 08, 2010 - 23:59 ET Ballot Closing Date: Monday October 18, 2010 - 23:59 ET RESPONSES: 161 eligible people are in this ballot group. 141 affirmative votes 3 negative votes with comments 0 negative votes without comments 7 abstention votes ======= 151 votes received = 93.8% valid returns = % valid abstentions APPROVAL RATE: 141 affirmative votes = 97.9 % affirmative 3 total negative votes = 2.1 % negative The Motion passes. There were 1355 comments received Bruce Kraemer (Marvell)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.