Presentation is loading. Please wait.

Presentation is loading. Please wait.

Steering Committee, Eurostat, Luxembourg, 4 February 2011

Similar presentations


Presentation on theme: "Steering Committee, Eurostat, Luxembourg, 4 February 2011"— Presentation transcript:

1 Steering Committee, Eurostat, Luxembourg, 4 February 2011
ESSnet Culture Steering Committee, Eurostat, Luxembourg, 4 February 2011 Task Force 1 Framework and Definitions

2 From September 2009 to January 2011:
ESSnet Culture Steering Committee - TF1 From September 2009 to January 2011: 5 TF1 meetings ... 1st Restricted Meeting: 27 November 2009 9 Member States: AT, CZ, EE, ES, FR, LU, NL, SE, UK 1st Enlarged Meeting: 8 December 2009, following the ESSnet kick-off 15 attending MS: AT, CH, CZ, EE, EL, ES, FI, FR, IT, LT, LU, NL, PL, PT, SE, UK 2nd Restricted Meeting coupled with TF3: 22 March 2010 12 MS participated : AT, EE, ES, DE, DK, FI, FR, IT, LU, NL, SE, UK 2

3 … and various written consultations
ESSnet Culture Steering Committee - TF1 … and various written consultations 3rd Restricted Meeting with TF3: 8-9 November 2010 9 MS participated: EE, DK, FI, FR, IT, LU, NL, SE, UK 4th Restricted Meeting: 28 January 2011 7 MS participated: EE, FI, FR, LU, NL, SE, UK Circa, documents sent for comments, questionnaires and specific messages 3

4 ESSnet Culture Steering Committee - TF1 Achieved steps 4

5 Structure of the framework settled
ESSnet Culture Steering Committee - TF1 Structure of the framework settled 5

6 Conceptual matrix and its layers
ESSnet Culture Steering Committee - TF1 Conceptual matrix and its layers 6

7 ESSnet Culture Next steps (1) Steering Committee - TF1
Final RM in 1 April cards on domains to be completed by TF1 participants: precisions on definitions, on content, correspondence with nomenclatures, summary of available sources, illustrative data, recommendations 7

8 ESSnet Culture Next steps (2) Steering Committee - TF1
Draft of the Tf1 Final report for 31 May to Coordination General gathering and writing Selection of the documents and tables to integrate in the Final Report: generalities (guidelines, method, points of discussions, recommendations), Excel tables, matrix and layers, specific chapters (ICH / cultural satellite account). 8

9 ESSnet Culture Next steps (3) Steering Committee - TF1
Consultation in July 2011 TF  participants  members, Updated and final version of the FR, August 2011 9

10 ESSnet Culture Steering Committee - TF1 Thank you for your attention.
10


Download ppt "Steering Committee, Eurostat, Luxembourg, 4 February 2011"

Similar presentations


Ads by Google