1 Application Issues & Solutions

2 Steel reinforced termination joint. Solution: Imbedded Fiberglass Mesh

3 Repair of termination joints.

4 Completed repairs on termination joints

5 Drains Excessive material build-up.

6 Solution: Geo-Seal (Create new substrate)

7 Waterslide concrete support pillars. Solution: Geo-Seal

8 Walking bridge pillars repair. Solution: Geo-Seal

9 Conduit liner penetration
Conduit liner penetration. Solution: Liner re-installed under the conduit and re-sprayed

10 Reservoir termination joints. Solutions: Trowel Grade

11 Re-enforced protection on penetration detail.

12 Solution: Geo-seal and re-sprayed.

13 Repair of lap joints.

14 Liner lock down pins. Solution: Re-install and Geo-seal.

15 Installation of new Vents and drainage

16 Contaminated spray hose (with mineral spirits) Improper line flush

17 Geo-seal joint tape

18 Problem: Surface pin-holes. Improper application over coal tar pitch
Problem: Surface pin-holes. Improper application over coal tar pitch. No sealer previously applied.

19 Surface blow holes, from off gassing of cold tar pitch

20 Problem: Substrate not properly prepared Solution: Power wash any loose or poor concrete until they get a good firm substrate to adhere to. (may require a penetrating sealer if the concrete is too far gone.)

21 Trapped water blisters.

22 It is normal for some blistering to occur
It is normal for some blistering to occur. A small number of blister heads should be sampled and checked for proper membrane thickness. If the samples have the required membrane thickness (80 mils nominal/60 mils minimum), then the remaining blisters should not be punctured or cut. If the samples have less than the minimum 60 mils, then the area can either be re-sprayed to obtain the proper thickness. Or the blisters can be cut out and the area re-sprayed or patched with Liquid Rubber Trowel Grade, to a minimum thickness of 80 dry mils over the cut-out area extending a minimum of three inches (3") beyond the cut.