Presentation is loading. Please wait.

Presentation is loading. Please wait.

+ RRM SG Telecon 1/8/03 August 2002 doc.: IEEE /506r0

Similar presentations


Presentation on theme: "+ RRM SG Telecon 1/8/03 August 2002 doc.: IEEE /506r0"— Presentation transcript:

1 + RRM SG Telecon 1/8/03 August 2002 doc.: IEEE 802.11-02/506r0
January 2003 RRM SG Telecon 1/8/03 + Richard Paine, Boeing Richard Paine, Boeing

2 RRM Mechanisms Setup MIBs (per-AP, per-Client)
January 2003 RRM Mechanisms Setup MIBs (per-AP, per-Client) Passively Observed Parameters Transfer of Parameters Between STA and AP Actively Measured Parameters Richard Paine, Boeing

3 Special Management Frames
January 2003 RRM Setup Mechanism Probe Reponse Beacon Special Management Frames Richard Paine, Boeing

4 January 2003 MIBs { Richard Paine, Boeing

5 Passively Observed Para
January 2003 Passively Observed Para Observed RSSI Observed SNR Richard Paine, Boeing

6 Transfer Between STA and AP
January 2003 Transfer Between STA and AP Richard Paine, Boeing

7 Actively Measured Parameters
January 2003 Actively Measured Parameters Richard Paine, Boeing

8 PHY Layer Management Entity (PLME) MAC Layer Management Entity (MLME)
January 2003 Need Mechanisms MAC sublayer PLCP sublayer PMD sublayer PHY Layer Management Entity (PLME) PHY SAP PMD SAP Station Management Entity (SME) MAC Layer Management Entity (MLME) PLME SAP MLME SAP MAC SAP Richard Paine, Boeing

9 Conclusions Setup – need definition of setup
January 2003 Conclusions Setup – need definition of setup MIBs (per-AP, per-Client) - have Passively Observed Parameters – need mechanism Transfer of Parameters Between STA and AP – need mechanism Actively Measured Parameters – need h mechanism Richard Paine, Boeing


Download ppt "+ RRM SG Telecon 1/8/03 August 2002 doc.: IEEE /506r0"

Similar presentations


Ads by Google