Presentation is loading. Please wait.

Presentation is loading. Please wait.

General update on the status of the NEMOs’ proposals

Similar presentations


Presentation on theme: "General update on the status of the NEMOs’ proposals"— Presentation transcript:

1 General update on the status of the NEMOs’ proposals
11th Market European Stakeholder Committee

2 Timeline for MCO Plan implementation + methodologies
June MCO Plan approved by All NRAs ( October All NEMOs semd to all NRAs amended versions of MCO Methodologies ( December NRAs’ decision on amended NEMO Methodolgies - All TSOs send to all NRAs amended version of SEC Methodology SDAC targeted implementation timeline June SDAC GoLive [Initial Req., Multi Nemo, SEC, EU+Norway, limited scalability, limited repeatability] January Interim Change Control Procedure and the Algorithm Monitoring Procedure June Adequate repeatability December NEMOs shall consult on outcomes of the research and development activities December Future Requirements Adequate scalability - Detailed description of the enduring solution, - Enduring Change Control Procedure and the Algorithm Monitoring Procedure - Prototyping phase of the “other functionalities”

3 SIDC targeted implementation timeline
Q Initial GoLive December SIDC compliance [Initial Req., Multi Nemo, delivery of results, maximization of economic surplus, enhanced preferred shipper, limited scalability] January Interim Change Control Procedure and the Algorithm Monitoring Procedure December NEMOs shall consult on outcomes of the research and development activities December Future Requirements and Adequate scalability - Detailed description of the SIDC enduring solution - Enduring Change Control Procedure and the Algorithm Monitoring Procedure


Download ppt "General update on the status of the NEMOs’ proposals"

Similar presentations


Ads by Google