Presentation is loading. Please wait.

Presentation is loading. Please wait.

TTC meeting, Milano Global Design Effort

Similar presentations


Presentation on theme: "TTC meeting, Milano Global Design Effort"— Presentation transcript:

1 TTC meeting, Milano Global Design Effort
High Power Tests in the S1-Global Cryomodule E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

2 TTC meeting, Milano Global Design Effort
International Team for S1-Global A. Bosotti, C. Pagani, R. Paparella, P. Pierini, INFN (Italy) K. Jensch, D. Kostin, L. Lilje, A. Matheisen, W.-D. Moeller, M. Schmoekel, P. Schilling, H. Weise, DESY (Germany) T. Arkan, S. Barbanotti, M. Battistoni, H. Carter, M. Champion, A. Hocker, R. Kephart, J. Kerby, D. Mitchell, Y. Pischalnikov, T.J. Peterson, M. Ross, W. Schappert, B. Smith, FNAL (USA) C. Adolphsen, C. Nantista, SLAC (USA) M. Akemoto, S. Fukuda, K. Hara, H. Hayano, N. Higashi, E. Kako, H. Katagiri, Y. Kojima, Y. Kondo, T. Matsumoto, S. Michizono, T. Miura, H. Nakai, H. Nakajima, K. Nakanishi, S. Noguchi, N. Ohuchi, T. Saeki, M. Satoh, T. Shishido, T. Shidara, T. Takenaka, A. Terashima, N. Toge, K. Tsuchiya, K. Watanabe, S. Yamaguchi, A. Yamamoto, Y. Yamamoto, K. Yokoya, KEK (Japan) E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

3 TTC meeting, Milano Global Design Effort
Collaborative work for Cryomodule Assembly Tuner assembly (2010, Feb.) Cavity string assembly (2010, Jan.) KEK Cavity string assembly (2010, Mar.) Coupler assembly (2010, Mar.) E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

4 TTC meeting, Milano Global Design Effort
Collaboration for Cryomodule Tests Cavity processing (2010, Sept.) Tuner performance tests (2010, July) Lorentz detuning tests (2010, Oct.) Dynamic loss meas. (2010, Nov.) E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

5 TTC meeting, Milano Global Design Effort
Outline Cavity performance Dynamic loss measurements Lorentz detuning & Mechanical vibration 7-cavity operation by one Klystron E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

6 TTC meeting, Milano Global Design Effort
Cavities, Tuners, Couplers in S1-G Cryomodule TESLA Cavity (DESY/FNAL) Tesla-like Cavity (KEK) Slide-Jack Tuner (KEK) Blade Tuner (FNAL) Saclay Tuner (DESY) Comparison of Performance TTF-III Coupler (DESY/FNAL) STF-II Coupler (KEK) E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

7 TTC meeting, Milano Global Design Effort
Vertical Test Results of 8 Cavities 2 cavities from FNAL 2 cavities from DESY 4 cavities from KEK 8 Cavities for S1-Global (ave. 30 MV/m) E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

8 TTC meeting, Milano Global Design Effort
Comparison of cavity performance ave. Eacc,max VT : 30 MV/m 1 cav : 27 MV/m 7 cav : 26 MV/m C D D AES004 ACC011 Z108 Z109 MHI-05 MHI-07 D : Detune C : Coupler MHI-06 MHI-09 FNAL DESY KEK E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

9 TTC meeting, Milano Global Design Effort
Comparison of cavity performance Cryomodule - C Cryomodule - A Degradation of Eacc,max Tuner Trouble Coupler Vacuum Tuner Trouble C1 C2 C3 C4 A1 A2 A3 A4 U X-ray M X-ray D X-ray Up-stream Down-stream E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

10 TTC meeting, Milano Global Design Effort
Comparison of cavity performance Degradation of Eacc,max A1 A2 C1 C2 at 25MV/m A3 C4 A4 C3 at 25MV/m E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

11 TTC meeting, Milano Global Design Effort
Qo values measured by dynamic loss 7 cav. C4 A2 A2 4 cav. C1 A3 Dynamic loss at input coupler (Detuning at 32 MV/m) TTF-III : 0.5 W / 4 couplers STF-II : 4.6 W / 4 couplers E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

12 TTC meeting, Milano Global Design Effort
Frequency shift due to Lorentz detuning C4/Z109 (29MV/m) A2/MHI-06 (38MV/m) Pre-detuning by motor tuner & piezo tuner with DC voltage Rise Time Rise Time Flat Top Flat Top Compensation by piezo tuner in pulsed operation 200~500 Hz FB/on, Piezo/off 2~3 kHz FB/on, Piezo/off E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

13 TTC meeting, Milano Global Design Effort
Frequency shift due to Lorentz detuning Cryomodule-C Cryomodule-A TESLA cavity + Blade tuner Tesla-like cavity + Slide-jack tuner Total : D f = -0.90, (Eacc)2 Rise Time : D f = -0.46, (Eacc)2 Flat Top : D f = -0.43, (Eacc)2 Total : D f = -0.70, (Eacc)2 Rise Time : D f = -0.56, (Eacc)2 Flat Top : D f = -0.14, (Eacc)2 E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

14 TTC meeting, Milano Global Design Effort
Frequency shift due to Lorentz detuning Cryomodule-C Cryomodule-A TESLA cavity + Saclay tuner Tesla-like cavity + Slide-jack tuner Total : D f = -1.22, (Eacc)2 Rise Time : D f = -0.49, (Eacc)2 Flat Top : D f = -0.73, (Eacc)2 Total : D f = -0.69, (Eacc)2 Rise Time : D f = -0.55, (Eacc)2 Flat Top : D f = -0.14, (Eacc)2 E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

15 TTC meeting, Milano Global Design Effort
Comparison of Detuning Frequency by LFD TESLA cavity Blade tuner TESLA cavity Saclay tuner Tesla-like cavity Slide-jack tuner AES004 Z108 Z109 MHI-05 MHI-07 ACC011 MHI-06 MHI-09 FNAL DESY KEK E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

16 TTC meeting, Milano Global Design Effort
Mechanical Vibration Modes by Piezo Sensors 1.5 ms, 5 Hz, operation A1/MHI-05 20 MV/m A2/MHI-06 33 MV/m A3/MHI-07 A4/MHI-09 33 MV/m 18 MV/m E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

17 TTC meeting, Milano Global Design Effort
4-Cavity Operation in Cryomodule-A FB/on, Piezo/off, ave. Eacc = 28.4 MV/m Dominant mechanical vibration mode 540Hz 220Hz 325Hz 210Hz A1/MHI-05 A2/MHI-06 A3/MHI-07 A4/MHI-09 Eacc = 23.7 MV/m 25.6 MV/m 31.1 MV/m 23.0 MV/m E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

18 TTC meeting, Milano Global Design Effort
Mechanical Vibration Modes kicked by Piezo tuner (Low RF Power meas.) Vpiezo = +40V, 1 kHz (1 pulse) C1/AES004 C2/ACC011 179Hz 204Hz 509Hz 345Hz 356Hz 260Hz 245, 252Hz C3/Z108 C4/Z109 322Hz 313Hz 448Hz 436Hz E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

19 TTC meeting, Milano Global Design Effort
4-Cavity Operation in Cryomodule-C FB/on, Piezo/off, ave. Eacc = 22.5 MV/m Dominant mechanical vibration mode 179Hz 204Hz 260Hz 245Hz C1/AES004 C2/ACC011 C3/Z108 C4/Z109 Eacc = 24.6 MV/m 21.3 MV/m 16.8 MV/m 27.0 MV/m E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

20 TTC meeting, Milano Global Design Effort
Required rf power for 8-cav. operation Stable operating Eacc (individual cavity) Calc. ave. Eacc C : 25 MV/m A : 29 MV/m C&A : 27 MV/m 38 MV/m 33 MV/m 29 MV/m 26 MV/m 24 MV/m 23 MV/m 18 MV/m 20 MV/m AES004 ACC011 Z108 Z109 MHI-05 MHI-07 MHI-06 MHI-09 FNAL DESY KEK E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

21 TTC meeting, Milano Global Design Effort
7-cavity operation in Cryomodule-C&A Ave. Eacc = 26.2 MV/m ; FB/on, Piezo/on, MHz 100Hz/div C : ave. 25 MV/m 100Hz/div 100Hz/div C2 : Detune A : ave. 27 MV/m 200Hz/div 200Hz/div 100Hz/div 100Hz/div C1 : 26 MV/m C3 : 18 MV/m C4 : 30 MV/m A1 : 16 MV/m A2 : 39 MV/m A3 : 34 MV/m A4 : 22 MV/m E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

22 TTC meeting, Milano Global Design Effort
Stability of Detuning Frequency Cryomodule - C Piezo/on C1 C2 (Detune) C3 C4 12.4Hz (rms) 33.2Hz (rms) 38.6Hz (rms) 2h Cryomodule - A A1 A2 A3 A4 Piezo/on 4.6Hz (rms) 7.3Hz (rms) 7.3Hz (rms) 9.9Hz (rms) E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

23 TTC meeting, Milano Global Design Effort
SUMMARY Ave. Eacc of 26 MV/m was successfully demonstrated in the 7-cavity operation by the vector-sum control. Two cavities showed the performance degradation of the Eacc,max from vertical tests to cryomodule tests. The x-rays radiation levels were higher than others. Two frequency tuning systems did not work correctly. Qo values measured by dynamic rf losses were lower than 1x1010 in each cavity. This cause might be due to electron loading with strong x-rays radiation. Frequency shifts by Lorentz detuning in the KEK cavities were much less than those in the TESLA-type cavities. This is due to the stiff structure in the KEK cavities. Stability of the detuning frequency in the KEK cavities was much better than those in the TESLA-type cavities. E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort

24 TTC meeting, Milano Global Design Effort
END E. KAKO (KEK) ' Feb 28 TTC meeting, Milano Global Design Effort


Download ppt "TTC meeting, Milano Global Design Effort"

Similar presentations


Ads by Google