Value Engineering in a Manufacturing Facility
Stephen Papa
2
Dresser-Rand Company has been among the largest global suppliers of rotating equipment solutions.
Compressors Steam Turbines Expanders Gas Turbine Packages Control Systems
3
The Problem: Moving the Dresser Rand’s compressor cases around the facility Rotate a case 90 degrees from vertical. To support the case for both horizontal and vertical movements. To support more than 100,000 pounds. Currently process can be: Unsafe Damaging to the case Damaging to the facility.
4
Mission Statement: The objective of this project is to develop, design and build a safe compressor lifting technique for flipping and rotating finished compressor cases for the Dresser Rand Olean Manufacturing Facility. Key Business Goals: Increase safety (operators, cases, facility) Complete the case flipping and rotating quicker Reduce the number of operators Reduce the ergonomic and human factors effects
5
Staffing Requirements:
This senior design project should be appealing to a student that is interested in: Value Engineering in a manufacturing facility Manufacturing and Production Engineering Designing and developing tooling for a manufacturing facility Ergonomics and Human Factors Staffing Requirements: 2 IE’s: Ergonomics / Human Factors Engineer Manufacturing and Production Engineer 3 ME’s: Design Engineer Process Engineer Structural Engineer:
6
Project Background Project Name: Value Engineering in a Manufacturing Facility Project Number: P08455 Primary Customer: Dresser Rand, Olean Manufacturing Facility Faculty Guide: Dr. James Taylor (ISE) Start Term: End Term: