SRWG Meeting 15-2 Power Plant Validation Tools
Eric Bakie July 2015
2
Agenda NERC MOD-026-1 / NERC MOD-027-1
Data Checking Tools Available from WECC Examples
3
NERC MOD-026-1
4
NERC MOD-027-1
5
Data Correction Procedures
6
Dynamics Data Checking Tools Available from WECC
Dynamic Generator Testing Package Single Machine Infinite Bus Data Checks GENS_Check_Data.p WECC (full case) Data Check SimulateWECC.p Data Check Program (4ia) bb.p cc.p Data Conversion Program (3ic) Play-In Tools
7
Program Documentation
8
Single Machine Infinite Bus Data Checks
GE PSLF EPCL on WECC Webpage Input Data Dynamics data File List of generators to be checked GENS_Check_Data.p Line Fault Under-Frequency Event Oscillation Event FIDVR Event AVR Reference Step Response Governor Reference Step Response
9
SMIB Tool
10
Underfrequency Event Suspect PSS Gain
Pm Pg Gate efd freq
11
Underfrequency Event Suspect Governor Deadband (BLF = 0)
Pm freq
12
WECC Case Data Checks Simulate WECC.p No Disturbance Brake Insertion
2 PV Line Fault
13
4ia Program
14
Suspect Parameter found by data check program
15
bb.p EPCL
16
Example – Step Response Test
17
Example – Step Response Test
18
Example – Step Load Test
19
Typical Data Checks performed by IPCO
20
Play-In Validation
21
Additional Resources Model User Guide for Generic Renewable Energy System Models
22
Phase 2 REMTF Models