1 Module Testing Status Week of 3/14-3/18

2 This Weeks ARCS Testing
UCSB FNAL 32 HPK TOB L56p 30 Grade A 1 Grade B 1 Grade F DCU Failure 3 HPK TOB L34p 3 Grade A 7 ST TOB L34p 7 Grade A 6 HPK TOB L56p 5 Grade A 1 Grade B/F Sensor scratch and wire bond damage during inspection

3 ARCS Testing Issues On some modules VPSP=30 (instead of 35) needed to get sensible results Lack of sensor testing data makes it difficult to determine causes of shorts due to scratches Started testing new ARCS version 8 at UCSB Appears to have bugs, so we will not switch

4 This Weeks LT Testing UCSB FNAL 35 HPK TOB L56p 2 HPK TOB L34p
34 Grade A 1 Grade B 2 HPK TOB L34p 2 Grade A 5 HPK TOB L56p 5 Grade A

5 LT Testing Issues At UCSB, slot 8 has intermittent problems with initializing and low noise Will investigate more when we have time