Download presentation
Presentation is loading. Please wait.
1
Security and Lawful Interception
DOCUMENT #: GSC13-PLEN-30 FOR: Presentation SOURCE: TIA AGENDA ITEM: Security and Lawful Interception, 6.3 CONTACT(S): Cheryl Blum Security and Lawful Interception TIA TR-45.6 cdma2000 Wireless Packet Data Technology Lawful Intercept Group (LIG) Submission Date: July 1, 2008
2
Highlight of Current Activities (1)
TR-45.6 cdma2000 Wireless Packet Data Technology Lawful Intercept Group (LIG) The TR-45.6 LIG Focus Group is responsible for developing lawful intercept (LI) standards for cdma2000 and providing input to TIA and TR-45 on issues relative to CALEA and LI issues before the U.S. Federal Communications Commission (FCC). Recently Completed TIA-1066 LAES for cdma2000® Voice over IP (VoIP) Based on ATIS LAES for VoIP TIA-1072 LAES for cdma2000® Push-to-Talk over Cellular (PoC) In Progress TIA-1118 LAES for cdma2000® Wireless LAN-Interworking Projected publication by 4Q08
3
Highlight of Current Activities (2)
Recently Completed TIA-1066 LAES for cdma2000® Voice over IP (VoIP) Based on ATIS LAES for VoIP TIA-1072 LAES for cdma2000® Push-to-Talk over Cellular (PoC) In Progress TIA-1118 LAES for cdma2000® Wireless LAN-Interworking Projected publication by 4Q08 Overview Upcoming Activity J-STD-025-B Deficiency Study Study on Impact of DOJ Petition to the FCC Regarding Deficiencies in LAES for cdma2000 Packet Data
4
Strategic Direction Cooperative work with other SDOs, leveraging existing/on-going LI standards/specifications when possible, while adding/addressing TIA technology specifics. Taking the lead on developing/studying LI solutions in new areas where necessary and not being addressed by other SDOs. Cooperative Projects of Interest 3GPP SA3-LI LI for a Common IMS LI Dynamic Triggering ATIS LAES for Advanced Conferencing Services Canadian LI Capabilities LAES for Next Generation Networks
5
Challenges Providing LI capabilities that meet ever expanding regulatory requirements while meeting and maintaining market needs and feasibility.
6
Next Steps/Actions Continue to monitor other SDO activity in areas of interest. Leverage other SDO standards/specifications when available. Initiate new work in LI areas not being addressed by other SDOs
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.