Presentation is loading. Please wait.

Presentation is loading. Please wait.

Value Engineering In Design

Similar presentations


Presentation on theme: "Value Engineering In Design"— Presentation transcript:

1 Value Engineering In Design
March 22, 2012 Aspects of Design that effect Cost Material Requirements Project Schedule Contractor Access Minimizing Risk Value Engineering In Design Aspects of Design that Affect Cost

2 Material Requirements Concrete and asphalt
Higher quality = increased cost Sourcing / location Upfront mix design approval Amount of material vs. fixed testing costs March 22, 2012

3 Accelerated schedule = increased cost Construction phasing
March 22, 2012 Project Schedule Accelerated schedule = increased cost Construction phasing Onsite / offsite phases Limits effect on mission Used to balance schedule / cost

4 Limits productivity = increased cost
March 22, 2012 Contractor Access Limits productivity = increased cost Time sensitive work items – Paving Compromise between security / mission operations and construction

5 Detailed and clear bidding documents/SOW Existing conditions + weather
March 22, 2012 Minimizing Risk Detailed and clear bidding documents/SOW Existing conditions + weather Designs that limit exposure Protect subgrade and underlying materials Material submittals approval prior to construction