1
VELO RICH 1 INSTALLATION PLATFORM BALCONY BALCONY
INSTALLATION MEETING 28 JULY 2005, NIKHEF F.A. MUL. M. DOETS INSTALLATION PLATFORM DETECTOR HOOD TRANSPORTER CRANE LINE VELO CRANE LINE RICHT & LEFT DETECTOR SUPPORT TRANSPORTER RICH 1 DETECTOR TRANSPORTER RICHT DETECTOR TRANSPORTER LEFT BALCONY BALCONY
2
? ALIGNMENT OF THE VELO ON INTERACTION POINT (BY CERN)
INSTALLATION MEETING 28 JULY 2005, NIKHEF F.A. MUL. M. DOETS ALIGNMENT OF THE VELO ON INTERACTION POINT (BY CERN) ?
3
SERVICE OF THE VELO CRANE FOUR WAY CROSS DETECTOR SUPPORTS
INSTALLATION MEETING 28 JULY 2005, NIKHEF F.A. MUL. M. DOETS SERVICE OF THE VELO CRANE FOUR WAY CROSS DETECTOR SUPPORTS
4
INSTALLATION OF THE DETECTOR HALVES
INSTALLATION MEETING 28 JULY 2005, NIKHEF F.A. MUL. M. DOETS CRANE FOUR WAY CROSS INSTALLATION OF THE DETECTOR HALVES DETECTOR CRANE DEMAG DKUN-2/CF5 DK 400 Kg
5
(with in a no return valve) 400 V - 64 Amp DETECTOR HEATERS
INSTALLATION MEETING 28 JULY 2005, NIKHEF F.A. MUL. M. DOETS POWER (BY CERN) TL LIGHT WATER IN AND OUT 20 ° C COMPRESSED AIR BAR (with in a no return valve) 400 V - 64 Amp DETECTOR HEATERS 230 V - 16 Amp TOOLING 230 V - 16 Amp GETTER PUMPS HEATERS
6
? INSTALLATION MEETING 28 JULY 2005, NIKHEF F.A. MUL. M. DOETS