Download presentation
Presentation is loading. Please wait.
1
GRPE/WLTP-IG/ DHC subgroup
DRAFT WLTP 6th DHC Meeting GRPE/WLTP-IG/ DHC subgroup 11~12 January 2011 Palais des Nations, Geneva
2
(ref.) Test Program of Validation 1
Table of Contents Contents Agenda Current Status In-use Data Collection Data Analysis Methodology Open Issues Next Actions (ref.) Test Program of Validation 1
3
1. In-use Data Collection
2. Current Status 1. In-use Data Collection In-use Data Traffic Statistical Information China EU Completed (on going for more data acquisition) India On going (expected to complete by Jan. 2011) Japan Korea USA 2. Methodology please refer to WLTP-DHC-06-xxe
4
Regional Weighting when developing the WLTC Threshold Speed for L/M/H
3. Open Issues Regional Weighting when developing the WLTC Threshold Speed for L/M/H High Phase Cycle Construction (US&EU versus Asian region) Mode Construction Unique Weighting Factor for L/M/H Phase Gear Shift Points How to treat the vehicles which are not able to follow the prescribed cycle These lists are in my mind at this moment. We need to wait until initial analysis for making decision, On the other hands, some of items need political decision. So, I’m NOT going to present all items listed above in the next DHC meeting.
5
Detailed plan for validation1 1st draft test procedure
4. Next Actions up to Validation 2 2011 Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Meetings In-use data collection Develop the harmonized cycle Validation DTP Activities original current 7th DHC 8th DHC 9th DHC 62nd GRPE 10th DHC The threshold of L/M/H Mode construction Detailed plan for validation1 Introduce 1st WLTC Introduce 2nd WLTC Detailed plan for validation2 Final DEADLINE Modify, if necessary Initial analysis Develop 1st WLTC Validation1 Validation2 preparation 1st draft test procedure
6
5. Test Program of Validation 1
I’m still working on…………….
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.