Download presentation
Presentation is loading. Please wait.
1
CEE 424 GIS for Civil Engineers
Group 3: Alexandra Nightingale Rachel Curtin Richard Proszek
2
Project Goal: What areas in Gifford Pinchot National Forest are suitable for timber harvest?
3
Project Area
4
Data Used Boundary of the Gifford Pinchot National Forest
Critical Owl Habitats North Spotted Owl habitat Grey Owl habitat Riparian Reserves Slope Topography Rivers Water body
5
Analysis Criteria for Harvestable Lands: Within the Forest Boundary
Outside Owl Habitat Outside Riparian Reserves Slope less than 60%
6
Analysis Tools used: Clip Union Select
Total Area Of Harvestable Land ≈ 2 million acres
7
Estimated Worth of Harvestable Land in GPNF ≈ $19 billion
Analysis Revenue calculations: Washington State Department of Revenue Stumpage Values Per Thousand Board Feet Estimated Worth of Harvestable Land in GPNF ≈ $19 billion
8
Conclusions: Total Area Of Harvestable Land ≈ 2 million acres
Estimated Worth of Harvestable Land in GPNF ≈ $19 billion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.