Presentation is loading. Please wait.

Presentation is loading. Please wait.

Agenda for the internal review (09/05/12 1-5p 311 Newman)

Similar presentations


Presentation on theme: "Agenda for the internal review (09/05/12 1-5p 311 Newman)"— Presentation transcript:

1 Agenda for the internal review (09/05/12 1-5p 311 Newman)
Purpose of the internal, external review and project obj. (Georg), 15 min Cryomodule overview (Yun), 5 min SRF results and requirements (Matthias), 10 min Ancillary systems (coupler, tuner) (Vadim, Matthias), 10 min HOM loads (Ralf), 5 min Cryogenic principle of the module (Eric), 15 min Mechanical design, choice of material, production steps (Yun, 30 min) Stress and cool-down analysis (Yun, 10 min) Alignment, WPM (Yun), 5 min Instrumentation (Peter), 5 min Safety requirements and regulations (James), 10 min Schedule (Tim), 10 min Discussion, 30 min Agenda preparation for the external review, 15 min Total time scheduled: 2 h 55 min Proposition: not more than 5 min discussion, I break (15 min) at 2:30p


Download ppt "Agenda for the internal review (09/05/12 1-5p 311 Newman)"

Similar presentations


Ads by Google