Download presentation
Presentation is loading. Please wait.
1
Hall C Dump Status Beam Resuscitation Review
Anthony DiPette 3/4/2016
2
Hall C Dump Status - BRR Required for March Run Status Next Steps
3
Required for March 14-17 Run
Hall C Dump Status - BRR Required for March Run New Helium Tube Isolation Wall with Door & Radcon Lock Vacuum Tube with Temp Window Tune Mode Viewer
4
Hall C Dump Status - BRR Status Installed Install 3/4/16 Installed
5
Hall C Dump Status - BRR Status I & C to Complete Camera System
Inst – Fill Helium and Vacuum Tube w/ Helium Radcon – Install Lock
6
Hall C Dump Status - BRR Status End Section of He Pipe
7
Hall C Dump Status - BRR Status Isolation Wall
8
Hall C Dump Status - BRR Status Downstream Vacuum Pipe Section
Upstream Vacuum Pipe – with Actuators Installed
9
Camera Box with Periscope Tubes
Hall C Dump Status - BRR Status Camera Box with Periscope Tubes
10
Hall C Dump Status - BRR Status
High Power Viewer Periscope Tube, Diffuser Drive shaft, Iso Wall Door Hardware
11
Hall C Dump Status - BRR Next Steps
Complete Mech: Diffuser Drive & Blower, Tunnel Shielding, Iso Wall Grouting/Sealing, Aperture Plate & Window Water Cooling System, Camera Box Shielding, N2 System Final Connect and Commission Complete Diag: Diffuser Drive & Blower, Tune Mode Viewer, Calibration Puck, Water Cooling System, N2 System, Helium Monitoring, Ion Chamber Install and Commission
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.