P17452 Dresser-Rand System Health Monitor Detail Design Review

Similar presentations


Presentation on theme: "P17452 Dresser-Rand System Health Monitor Detail Design Review"— Presentation transcript:

1 P17452 Dresser-Rand System Health Monitor Detail Design Review
Anthony Ballister Dylan Boberg Jehad Al Dabbous Matthias Galley Fernando Soto Andrew Gordon

2 Agenda Team Vision (2:00 - 2:01) Decisions Thus Far (2:02 - 2:09)
Final Design (2:10 - 2:15) Signal Conditioning Circuit (2: :25) Bill Of Materials (2:26 - 2:29) Test Plans (2:30 - 3:39) System Level Use Case (2:40 - 2:44) Risk Management (2: :49) Gantt Chart (2:50 - 3:05) Questions

3 Team Vision This phase revolved primarily along finalizing design plans for our project. MSD II test plans, component simulations, prototyping etc. Primary focuses were spent finalizing documentation for smooth transition next semester, and executing ADC test plans to confirm sampling rates on multiple channels Tony

4 Decisions Thus Far Sampling: 1kHz, 9 Channels, 2 seconds, 1/hour
Storage: SD Card Wireless: Bluetooth Encasing: ABS Plastic Sensors: Existing sensors Accepting: Mini XLR, BNC Connectors Processing: Raspberry Pi Display: LED Mount: Rubber feet Power: AC power Receiver: Tablet Base Tech: Java Script (through HTML 5 or Native) Framework: Ionic 2 Graphics: D3 Tony

5 Final Design Matthias

6 Signal Conditioning Circuit Layout
Dylan

7 Signal Conditioning Circuit
Dylan

8 Amplifier/Voltage Divider Circuit (Acceleration)
Dylan

9 Amplifier/Voltage Divider Circuit (Pressure)
Dylan

10 Low Pass Filter Circuit
Jehad

11 BOM Matthias

12 Andrew

13 200Hz Sine Wave Sampled at 1kHz
Andrew

14 20kHz Sine Wave Sampled Andrew

15 Andrew

16 Fernando

17 Dylan

18 Revisiting the System Level Use Case
Fernando

19 Risk Management Tony

20 Plans for the Next Phase
Plans for MSD II: • Upon completion of the phase review, address final concerns • Prepare final presentation for Gate Review -- Test Plans -- Scheduling -- Costs Plans for MSD II: • Verify the completion of all MSD I phases and that they are properly updated • Properly document all remaining progress to ensure smooth transitioning • Construct a WBS for next semester Tony

21 Gantt Chart Mathias

22 Gantt Chart (MSD II) Mathias