1 Operations Research Lecture 9

2 Operations Research CPM / PERT

3 FLOATS INDEPENDENT FLOAT
Time by which an activity can expand without affecting other (PREV or SUBSEQ) I = jE - iL - D If Negative, take I = 0

4 Cont ! FREE FLOAT Time by which an activity can expand without affecting subsequent activity. F = jE - iE - D

5 Cont ! TOTAL FLOAT Time by which an activity can expand without affecting the overall duration of the project. T = jL - iE – D

6 Example 8 2 15 Activity 2-8 T = jL – iE – D = 39 – 16 – 15 = 9
F = jE – iE – D = 38 – 16 – 15 = 7 I = jE – iL – D = 38 – 24 – 15 = -1

7 Example 2 5 6 8 1 2 3 4 4 3 7 4 6 8 5 9 6

8 E=11 E=1 E=8 E=6 E=0 2 5 6 8 1 2 3 4 L=12 L=10 4 3 7 E=15 E=21 4 6 8 5 9 6 L=6 L=21 L=15 E=15 L=0 L=10 L=15

9 Cont ! ACT DUR START FINISH FLOAT E L E L T F I 1-2 1 0 9 1 10 9 0 0

10 Cont ! ACT DUR START FINISH FLOAT E L E L T F I 4-5 5 6 7 11 12 1 0 0

11 Cont ! 2 5 4 7 8 1 3 6 E=11 E=1 2 L=12 L=10 1 3 E=15 E=21 E=0 E=6 6 4
9 L=15 8 L=21 L=0 E=15 4 E=8 5 3 6 L=10 L=15

12 Example 6 4 5 25 40 2 3 4 7 20 5 10 50 55 3 9 2 8 15 30 45 12 35

13 Cont ! E=11 E=17 5 25 40 L=16 L=22 E=26 E=11 E=18 E=0 E=4 2 3 4 7 20 5
10 50 55 L=23 L=4 L=16 L=0 L=26 E=6 3 9 E=4 2 E=18 8 15 30 45 L=6 L=18 L=4 E=6 12 35 L=6

14 Cont ! 6 4 5 25 40 2 3 4 7 20 5 10 50 55 3 9 2 8 30 15 45 12 35

15 Cont… (Example) ACTI DUR START FINISH FLOAT E L E L T F I

16 Cont… (Example) ACTI DUR START FINISH FLOAT E L E L T F I

17 Example: Following table gives the activities of a construction project and duration.
Activity Duration 1 - 2 20 1 - 3 25 2 - 3 10 2 - 4 12 3 - 4 6 4 - 5

18 Cont ! Draw the network for the project. Find the total, free and independent floats for each activity. Find the critical path.

19 Cont ! 2 12 20 10 10 1 4 5 25 6 3

20 PERT

21 Non Cooperation from the workers Transport not effective
Example Supply of materials not in time Non Cooperation from the workers Transport not effective

22 Duration uncertain

23 Duration uncertain