Download presentation
Presentation is loading. Please wait.
1
Release 3 scope update – cont’d
XRN4539 – New file level rejection This change had been de-scoped based on DSG recommendation, and approved by Change Managers The change has been costed at circa 13k to deliver therefore was taken back to DSG to re-consider inclusion in scope DSG recommend the business benefit would be realised based on cost to deliver and therefore include in R3 scope. Request DSC Change Managers to approve inclusion in release 3 This is included in the R3 BER for approval at DSC Change Managers meeting.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.