Construction at a Glance
5-Year Obligation History FY 18 134 $23M FY 17 160 $16M FY 16 210 $15M FY 15 180 $11M FY 14 202 $17M
4
Anticipated Contracts
FY19 (1 Oct Sep 19) Anticipated Contracts FY19 Project Title Magnitude Remarks Method DSN‐ Repair CHPP Electrical Pnls&Circuits PH C (B6203) Between $100,000 and $250,000 Design A-E Design DSN‐ Repair Hursey Gate Final Denial Barrier DSN‐ Renovate CAC (B1300) Between $250,000 and $500,000 DSN‐ Repair Oscar Row Apron DSN‐ Repair Water Diversion Box at CHPP (B6203) Renovate PDF Rooms in B4370 Between $25,000 and $100,000 Construction SABER Replace Water Lines and Heat Trace from Well to B1099 Upgrade Flightline Ramp Lighting Replace Lights with LEDs in LRS Warehouse (B3426) Construct Storage for Snow Barn Between $500,000 and $1,000,000 F‐35 Renovate Muns Inspection Fac (B1324) for Blast Prot IFB Repair CHPP Reverse Osmosis Systems (B6203) Anti-Vehicle Cable and Fencing Along Richardson Highway Between $1,000,000 and $5,000,000 Ph B Repair Low Bay & Office Lighting & Controls (Multi) Repair Thunderdome Roof (B1140) Install Audible Fire Alarm Devices in CDC (B5182) F‐35 Renovate Engine MX Fac (B1346) for Metals Tech, NDI Repair Black Start Generator (B6203) Repair CHPP Electrical Pnls&Circuits PH B (B6203) Repair Runway Edge Lights F‐35 Renovate Permanent Party Dorm (B2262) Between $5,000,000 and $10,000,000
5
Anticipated Contracts
FY20/FY21 Anticipated Contracts FY20 Project Title Magnitude Planned Fiscal Yr Replace Sewer Line and Add Heat Trace from B1147 to B1148 Between $250,000 and $500,000 2020 Repair Opacity Readers on Boilers (B6203) Repair CHPP Electrical Pnls&Circuits PH C (B6203) Between $1,000,000 and $5,000,000 Repair Complete HVAC System (B1138) Construct Hursey Gate Final Denial Barrier and Road Repair Structural Columns of the Thunder Dome (B1140) Construct Storage for Snow Barn Repair Parachute Shop (B1161) Between $5,000,000 and $10,000,000 Repair South Ramp Entrance Taxiway T39A (B8021) Repair Storage Area for Contractors (B2204) Between $100,000 and $250,000 2021 Repair Fire Pump at Base Supply (B3426) Renovate Nose Dock 7 Exterior (B1232) Repair Roof: Maintenance Hangar Nose Dock 7 (B1232) Repair Concrete and Generator (B2258) Repair Boiler Stack in CHPP (B6203) Between $500,000 and $1,000,000 Install Locks on Utilidor Manhole Lids (B9000) Repair Concrete Pads on Runway Repair CEMAS Parking Lot (B9060) Repair Water Diversion Box at CHPP (B6203) Repair Fire Suppression System (B3425) Repair South Loop Taxiway Phase 1 Repair Papa Quebec Pavement Repair Oscar Row Apron