Download presentation
Presentation is loading. Please wait.
1
P09701: Corning Tropel LightGage Metrology System
Matthew Bradley (PM, ME) Cara Portka (ISE) Benjamin Arkin (EE) Nicholas Schneider (ME)
2
Outline Purpose: To share MSD progress and experience in order to encourage constructive criticism/feedback and incite new ideas. Objective: Present Week 2 update with deliverables. 4/28/2019
3
Deliverable Status - Week 3
Final Specifications Complete Selected Concept End of Day Final Project Plan End of Day Action Items Reformat 1-Page Summary Complete Upload Documents to Edge Complete 4/28/2019
4
Concept 1 Granite Base (Tropel) 3 Stainless Plates
2 “Guide” Slide Rails (COTS) 1 Motorized Linear Slide (COTS) 3 Fine Adjust/Null Motors 2 LightGage Heads (Tropel) 4/28/2019
5
Concept 1 4/28/2019
6
Concept 2 Granite Base (Tropel) 4 Stainless Plates 3 Guide Rods
1 Coarse Adjust Motor 3 Fine Adjust/Null Motors 2 LightGage Heads (Tropel) For More Concepts Drawings and Team Design Process Visit: 4/28/2019
7
Matthew Bradley mjb8482@rit.edu Cara Portka csp1106@rit.edu
Benjamin Arkin Nicholas Schneider 4/28/2019
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.