Download presentation
Presentation is loading. Please wait.
1
Estimation of Rainfall over Bangladesh
Toru Terao(Osaka Gakuin Univ.)
2
TRMM 3A25 Monthly Jul Aug 1998 Bangladesh Flood 1999 2000
3
Rainfall South of Hills is not Represented?
CMAP Rainfall South of Hills is not Represented? Jul Aug 1998 Bangladesh Flood 1999
4
Raingauges in Bangladesh
BMD(Bang. Met. Dep.) Daily ×
5
CMAP Grids CMAP grids over Bangla. We examined...
Grid A: 12 BMD stations Grid B: 9 BMD stations Grid C: 9 BMD stations Grid D: No BMD stations D C A B
6
CMAP timeseries (JJAS)
B Good correlation after 1992 Significant underestimation in 1984 when severe flood attacked Bangladesh C
7
Comparison, Grid A Jun: 0.07 Jul: 0.46 Aug: 0.29 Sep: 0.25 JJAS: 0.08
-1991: -0.41 1992-: 0.95
8
Comparison, Grid B Jun: 0.30 Jul: 0.54 Aug: 0.62 Sep: 0.44 JJAS: 0.16
-1991: 0.06 1992-: 0.86
9
Comparison, Grid C Jun: 0.78 Jul: 0.79 Aug: 0.40 Sep: 0.66 JJAS: 0.63
-1991: 0.48 1992-: 0.96
10
Raingauges vs. Grid A A A
11
Raingauges vs. Grid B B B
12
Raingauges vs. Grid C C C
13
CMAP Grid vs. BMD Obs. Drastic change around 1991-1992
Small correlation before 1991 Significant Underestimation in 1984 Large correlation after 1992 Better estimation for grid C due to Indian data?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.