WELCOME WELCOME
2
New Highway Department Garage Facility
Town of Conway New Highway Department Garage Facility
3
EXISTING FACILITIES - IN THE CENTER OF TOWN
4
Why a new facility? Insufficient and outdated space to support operations Lack of equipment storage Lack of proper administration space Lack of adequate employee support space Employee health and safety concerns
5
Why a new facility? Potential threat to groundwater due to inadequate vehicle storage and run off from vehicle washing Code Compliance Inadequacies Fire and Life safety deficiencies Occupational Safety Health Act and Dept. of Environmental Protection deficiencies
6
Why a new facility? Extensive deferred maintenance Required
Facilities lack proper ventilation Facilities lack proper heating/air conditioning
12
FUNCTIONS of the Conway Highway Department
Maintains & Repairs Town-owned Roads and Sidewalks Repairs and Maintains Town’s Vehicles Maintains Town Drainage Systems Responsible for Snow and Ice Removal
13
What is Needed? Safer, Improved Worker Environment, including:
Private toilets ADA Accessibility Mechanic and Wash Bays Storage Bays for Tools, Supplies and Equipment Appropriate Heating, Lighting ,Ventilation and Energy Efficiencies
14
A New Facility Will Provide
A High Return On Investment by extending of the equipment Environmental Protection from Vehicle leaks Adequate Maintenance Space to Conduct Repairs Improved Employee Efficiency Safer Work Environment for Town Employees Potential for Future Growth Improved Employee Morale
15
The Proposed Design: Minimizes the Total Project Cost
Optimizes Opportunity with ADD Alternates Designed with Future “Green” Plans in Mind, Including a PV Array Allows for Future Growth on Site Provides improve control of environmental hazards Fits with rural appearance
16
A New Facility Will Provide
Improved Emergency Responses Safer Storage for the Town’s Critical Equipment Makes Additional Space Available for Ambulance and Fire
17
Concept: Develop A Central Highway Garage on
Fournier Road
20
Service Center Building
24
Projected Long-term Savings
Decreased unscheduled maintenance activities Increase in vehicle life expectancy, extending vehicle replacement schedules Improvement in productive labor associated with cold weather and storm event impacts
25
Reduced Vehicle Maintenance Costs:
The extreme temperature and precipitation fluctuations of weather are one of the primary causes of the premature deterioration of vehicle bodies and components, rubber parts and tires, paint oxidation and drive train components (due to cold/low flow lubrication). Brakes, axles, springs and exhaust systems are significantly compromised by outside storage as well. DPW vehicles can spend as much as seventy-five percent of their useful life parked in the open and unprotected from the elements, waiting to be placed in service. Preventive maintenance is also increased with outside storage due to lubrication fluid and grease breakdown caused by extreme temperatures.
26
Payback based on 2012 data from Mt Lebanon PA DPW -3
Payback based on 2012 data from Mt Lebanon PA DPW -3.5 additional years on average Simple Payback for Pole Barn Vehicle # of Vehicles Current Replacement costs (each)* Current Replacement costs (all) Useful life (Stored outdoors) Useful life (Stored indoors)** Years of Savings (based on 25 years for pole barn) Savings during the life of the pole barn*** Heavy Truck 4 $ 160,000.00 $ ,000.00 10 13.5 0.6 $ ,814.81 Light Dump Truck 2 $ 80,000.00 $ ,000.00 8 10.5 0.7 $ ,047.62 Pickup Truck 1 $ 40,000.00 $ ,000.00 $ ,761.90 Loaders $ 180,000.00 $ ,000.00 13 15.5 0.3 $ ,662.53 Mini excavator $ ,000.00 $ ,813.90 Over-the-fence mower $ 100,000.00 $ ,000.00 5 7.5 1.7 $ ,666.67 Tractor Road Grader $ 250,000.00 $ ,000.00 $ ,543.42 Trailers $ 12,000.00 $ ,000.00 $ ,444.17 $ 1,734,000.00 $ 976,568.92
27
Total Project Cost VERIFY FROM BIDS
*Including $420K for pole barn New Funding from borrowing $1,975,000 Balance from available funds
28
Cost of the Project per Household MORE INFO FROM TOM
$180/Year based on a home value of $300,000 Recommended by Finance Committee Recommended by Board of Selectmen
29
THANK YOU QUESTIONS and ANSWERS