General Assembly Meeting
WORK PACKAGE 4: Innovation of key neutronic technologies: Detectors and Moderators TASK 4.5: Moderator testing and development beamline
2
Overview of WP4 Task 4.5 Aims of Moderator testing and development beamline (TBL) provide design information for energy sensitive imaging of the ESS moderator perform test experiments at BRR on TBL component prototypes ensure design flexibility for further use of TBL beyond moderator commissioning assess operation safety and minimum interference with neighboring beamlines BrightnESS is funded by the European Union’s Horizon 2020 research and innovation programme under grant agreement No
3
Deliverables D4.4. Report on the engineering design of the BRR low dimensional moderator Due month: 12 Status: completed D4.7. Report on the conception design of the ESS and the BRR test beam-line Due month: 19 ESS TBL design (subcontracted) ready for CDR D4.15. Final verification of BRR moderator Due month: 36 Status: prepared, no delay foreseen The new BRR compact cold neutron moderator is unlikely to be ready for tests by the end of the BrightnESS project. Instead, thorough characterization of the existing moderator is proposed, and full operation tests of the ESS TBL prototype components. Test environment design completed, preliminary tests performed at BNC. BrightnESS is funded by the European Union’s Horizon 2020 research and innovation programme under grant agreement No
4
Milestones MS13. Modelling and experimental verification of the new moderator concept Due month: 10 Status: reached MS21. Verification of ESPI (energy sensitive pinhole imaging) setup. Due month: 20 MS26. Verification of prototype components (BRR & ESS). Due month: 29 Status: no delay foreseen MS28. Verification of moderator and ESPI components Due month: 32 BrightnESS is funded by the European Union’s Horizon 2020 research and innovation programme under grant agreement No
5
D4.7. ESS moderator Test Beamline geometry
6
D4.7. ESS moderator Test Beamline layout, prepared for CDR
7
D4.7. ESS moderator Test Beamline layout, prepared for CDR
8
MS21. Verification of ESPI (energy sensitive pinhole imaging) setup
9
Next steps Prepare test methodology and environment for TBL component prototype characterization, perform the experiments, process the obtained results and deliver the reports (D4.15, MS26 and MS28). Test and characterize the very high flux tolerant detector (solid boron converter, two layer, orthogonal construction) prototype as fallback solution for TBL. Risk factors in achieving these deliverables: unforeseen delays in production of TBL component prototypes. Unforeseen and unlikely non-availability of BNC beamlines. Mitigation: thorough mechanical and automation FAT, pre-manufacturing neutron tests of critical materials, final neutron tests at ESS. BrightnESS is funded by the European Union’s Horizon 2020 research and innovation programme under grant agreement No