Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hybrid & Module Testing Status

Similar presentations


Presentation on theme: "Hybrid & Module Testing Status"— Presentation transcript:

1 Hybrid & Module Testing Status
Week of 3/21-3/25

2 Hybrid Testing Status Weekly Cumulative Pass Fail % Pass L12pd 0.00%
Pass Fail % Pass L12pd 0.00% L34p 202 2 99.02% L56p 46 213 4 98.16% R5N 64 3 95.52% R5S 100.00% R6 87 1 98.86% R7 Total 612 10 98.39%

3 UCSB Hybrid Testing Failures
This Week 2 with Shorts in PA Should be repairable Cumulative 2 with Shorts in PA Repairable 1 Major Scratch in PA 1 Smashed APV-PA Bonds 2 Failed Inspection Never should have sent 1 Broken Ceramic 1 Bad Bond Feet 1 Weak Wirebonds

4 UCSB Hybrid Testing Issues
Need to finish validation of new software Bruno contacted about bugs/features Need to add automatic upload of data to new software

5 UCSB ARCS Testing Status
Weekly Cumulative A B F % A or B L12pu 0.00% L12pd L12su L12sd L34p 82 1 2 97.65% L56p 42 90 97.85% R5N R5S R6 6 100.00% R7 Total 178 4 97.83%

6 UCSB ARCS Testing Failures
This Week 1 with >2% Bad Channels 14 Noisy Channels in a row Cumulative 1 with >2% Bad Channels 1 Bad DCU 1 HV Shorted to CF Frame 1 with >20 mA Bias Current

7 UCSB LT Testing Status Weekly Cumulative Pass Fail % Pass L12pu 0.00%
Pass Fail % Pass L12pu 0.00% L12pd L12su L12sd L34p 3 83 100.00% L56p 43 80 R5N R5S R6 6 R7 Total 46 169

8 UCSB LT Testing Issues At UCSB, slot 8 has persistent problems with initializing and low noise Will investigate more when we have time


Download ppt "Hybrid & Module Testing Status"

Similar presentations


Ads by Google